CHANNEL TUNNEL - WILL WE ACT TO END SHEPWAY'S 175 YEAR-OLD BLIGHT?

Thomas Greening

Open publisher page 0 citations

Abstract

A total of 190 hectares of land in Shepway district has not been available for development for the past 175 years while the construction of a channel tunnel has been considered. The possible need and latest proposals for a fixed channel link are at present being considered by the British government. The author reviews the history of the channel tunnel project and outlines the present alternatives which fall into four groups: single rail tunnels, double track rail tunnels, road only links and a combined road/rail link. The local council strongly supports the BR/SNCF scheme for a single 6.02 M wide tunnel, with a 4.5 M service tunnel, accommodating continental loading gauge rolling stock. The total distance between portals would be 31 miles (49.4 km) with an average journey time of 35 minutes. Emphasis is being placed on low-cost, minimum disturbance projects that could be completed within a reasonable time.

About this research paper

What this paper is about

A total of 190 hectares of land in Shepway district has not been available for development for the past 175 years while the construction of a channel tunnel has been considered. The possible need and latest proposals for a fixed channel link are at present being considered by the British government. The author reviews the history of the channel tunnel project and outlines the present alternatives which fall into four groups: single rail tunnels, double track rail tunnels, road only links and a combined road/rail link. The local council strongly supports the BR/SNCF scheme for a single 6.02 M wide tunnel, with a 4.5 M service tunnel, accommodating continental loading gauge rolling stock. The total distance between portals would be 31 miles (49.4 km) with an average journey time of 35 minutes. Emphasis is being placed on low-cost, minimum disturbance projects that could be completed within a reasonable time.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

A total of 190 hectares of land in Shepway district has not been available for development for the past 175 years while the construction of a channel tunnel has been considered. The possible need and latest proposals for a fixed channel link are at present being considered by the British government. The author reviews the history of the channel tunnel project and outlines the present alternatives which fall into four groups: single rail tunnels, double track rail tunnels, road only links and a combined road/rail link. The local council strongly supports the BR/SNCF scheme for a single 6.02 M wide tunnel, with a 4.5 M service tunnel, accommodating continental loading gauge rolling stock. The total distance between portals would be 31 miles (49.4 km) with an average journey time of 35 minutes. Emphasis is being placed on low-cost, minimum disturbance projects that could be completed within a reasonable time.

Key concepts: Channel tunnel, Channel (broadcasting), Engineering, Transport engineering, Stock (firearms), Telecommunications, Civil engineering, Geography

Related papers

Back to paper searchBrowse research topicsOriginal source
CHANNEL TUNNEL - WILL WE ACT TO END SHEPWAY'S 175 YEAR-OLD BLIGHT? — Research Paper | ScholarLens