Interstate rail track upgrading options to 2014
Philip Laird, Max Michell
Abstract
Philip Laird, Max Michell
Abstract
As part of the AusLink White Paper released in June 2004, extensive funding was announced for upgrading interstate mainline track. The main aims are to reduce the transit times, increase capacity and reduce track maintenance costs. Particular attention is given to three proposed NSW rail deviations. All are designed to remove the impact of excessive curvature. The combined length of these deviations is 164 kilometre and they would replace 197 kilometre of track on steam age alignment. The benefits for a 'standard' intermodal freight train include a time saving of 84 minutes and a fuel saving of over 1000 litres of diesel. The regional benefits of track upgraded for faster and heavier freight trains may also include high-speed tilt passenger train services. The paper estimates combined benefits from the three rail deviations of about $24 million per year from reductions in train operating costs and track maintenance costs, and the potential reduction in net external costs with Sydney-Melbourne inter-city land freight. (a) For the covering entry of this conference, please see ITRD abstract no. E211825.
OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
As part of the AusLink White Paper released in June 2004, extensive funding was announced for upgrading interstate mainline track. The main aims are to reduce the transit times, increase capacity and reduce track maintenance costs. Particular attention is given to three proposed NSW rail deviations. All are designed to remove the impact of excessive curvature. The combined length of these deviations is 164 kilometre and they would replace 197 kilometre of track on steam age alignment. The benefits for a 'standard' intermodal freight train include a time saving of 84 minutes and a fuel saving of over 1000 litres of diesel. The regional benefits of track upgraded for faster and heavier freight trains may also include high-speed tilt passenger train services. The paper estimates combined benefits from the three rail deviations of about $24 million per year from reductions in train operating costs and track maintenance costs, and the potential reduction in net external costs with Sydney-Melbourne inter-city land freight. (a) For the covering entry of this conference, please see ITRD abstract no. E211825.
Key concepts: Track (disk drive), Train, Transport engineering, Freight trains, Kilometer, Rail freight transport, Transit (satellite), Environmental science