1991Unpublished venueRequires access

REPOMAN: AN OVERALL COMPUTER-AIDED DECISION SUPPORT SYSTEM FOR PLANNING RAIL REPLACEMENTS

D Acharya, Rabi G. Mishalani, C D Martland, James Eshelby

Open publisher page 7 citations

Abstract

The North American railroad industry spends hundreds of millions of dollars annually on installation of rails. Decisions made by different rail experts are likely to be inconsistent and result in an inefficient utilization of resources. This paper describes a computer-aided decision support system that uses expert systems, knowledge systems, and network optimization methods to efficiently arrive at a solution to the rail replacement scheduling problem. The scheduling system efficiently utilizes the automatically collected rail profile data obtained from the electronic rail profile measurement technology to produce a five-year rail replacement plan. This system has been successfully used to analyze about 20 percent of Burlington Northern Railroad's mainline track.

About this research paper

What this paper is about

The North American railroad industry spends hundreds of millions of dollars annually on installation of rails. Decisions made by different rail experts are likely to be inconsistent and result in an inefficient utilization of resources. This paper describes a computer-aided decision support system that uses expert systems, knowledge systems, and network optimization methods to efficiently arrive at a solution to the rail replacement scheduling problem. The scheduling system efficiently utilizes the automatically collected rail profile data obtained from the electronic rail profile measurement technology to produce a five-year rail replacement plan. This system has been successfully used to analyze about 20 percent of Burlington Northern Railroad's mainline track.

Why it matters

OpenAlex reports 7 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The North American railroad industry spends hundreds of millions of dollars annually on installation of rails. Decisions made by different rail experts are likely to be inconsistent and result in an inefficient utilization of resources. This paper describes a computer-aided decision support system that uses expert systems, knowledge systems, and network optimization methods to efficiently arrive at a solution to the rail replacement scheduling problem. The scheduling system efficiently utilizes the automatically collected rail profile data obtained from the electronic rail profile measurement technology to produce a five-year rail replacement plan. This system has been successfully used to analyze about 20 percent of Burlington Northern Railroad's mainline track.

Key concepts: Scheduling (production processes), Plan (archaeology), Decision support system, Expert system, Operations research, Rail network, Decision system, Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
REPOMAN: AN OVERALL COMPUTER-AIDED DECISION SUPPORT SYSTEM FOR PLANNING RAIL REPLACEMENTS — Research Paper | ScholarLens