GETTING THE BEST OUT OF TRACK RENEWAL MACHINES
David R. Burns
Abstract
David R. Burns
Abstract
Over 500 large machines of 30 different types are used by 35 railways for comprehensive replacement of track. Older types lift complete panels, but modern machines that can renew crossties and welded rail continuously are increasingly popular. These machines are being used in various ways; their productivity also varies and depends primarily on the planning of the complex operation of track renewal. In terms of manpower the Italian State Railways has proven most efficient, the result of a flexible and effective system of bidding by contractors.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Over 500 large machines of 30 different types are used by 35 railways for comprehensive replacement of track. Older types lift complete panels, but modern machines that can renew crossties and welded rail continuously are increasingly popular. These machines are being used in various ways; their productivity also varies and depends primarily on the planning of the complex operation of track renewal. In terms of manpower the Italian State Railways has proven most efficient, the result of a flexible and effective system of bidding by contractors.
Key concepts: Track (disk drive), Bidding, Lift (data mining), Transport engineering, Engineering, Railway system, Productivity, Computer science