1981•Railway gazette internationalRequires access

GETTING THE BEST OUT OF TRACK RENEWAL MACHINES

David R. Burns

Open publisher page 1 citations

Abstract

Over 500 large machines of 30 different types are used by 35 railways for comprehensive replacement of track. Older types lift complete panels, but modern machines that can renew crossties and welded rail continuously are increasingly popular. These machines are being used in various ways; their productivity also varies and depends primarily on the planning of the complex operation of track renewal. In terms of manpower the Italian State Railways has proven most efficient, the result of a flexible and effective system of bidding by contractors.

About this research paper

What this paper is about

Over 500 large machines of 30 different types are used by 35 railways for comprehensive replacement of track. Older types lift complete panels, but modern machines that can renew crossties and welded rail continuously are increasingly popular. These machines are being used in various ways; their productivity also varies and depends primarily on the planning of the complex operation of track renewal. In terms of manpower the Italian State Railways has proven most efficient, the result of a flexible and effective system of bidding by contractors.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Over 500 large machines of 30 different types are used by 35 railways for comprehensive replacement of track. Older types lift complete panels, but modern machines that can renew crossties and welded rail continuously are increasingly popular. These machines are being used in various ways; their productivity also varies and depends primarily on the planning of the complex operation of track renewal. In terms of manpower the Italian State Railways has proven most efficient, the result of a flexible and effective system of bidding by contractors.

Key concepts: Track (disk drive), Bidding, Lift (data mining), Transport engineering, Engineering, Railway system, Productivity, Computer science

Related papers

Back to paper searchBrowse research topicsOriginal source
GETTING THE BEST OUT OF TRACK RENEWAL MACHINES — Research Paper | ScholarLens