1980New Civil EngineerRequires access

CITY RAIL LINK SQUEEZES INTO OLD TUNNEL

M Winney

Open publisher page 0 citations

Abstract

The article describes the removal of extensive sections of brick invert along the London city line tunnel between Kings Cross and Farrington to increase clearances for operating British Rail electric services into Moorgate. The extreme caution exercised in the removal of about 200 separate breakouts which were made at six locations is emphasized. A Krupp 200 breaker was used for the work, the brickwork being replaced by reinforced concrete. Reference is made to traffic control during concreting operations. Around 150 cubic metres of pumped ready mixed concrete was moved up to 200 metres each day. A Pact system paver will be used to slipform the concrete track bases.

About this research paper

What this paper is about

The article describes the removal of extensive sections of brick invert along the London city line tunnel between Kings Cross and Farrington to increase clearances for operating British Rail electric services into Moorgate. The extreme caution exercised in the removal of about 200 separate breakouts which were made at six locations is emphasized. A Krupp 200 breaker was used for the work, the brickwork being replaced by reinforced concrete. Reference is made to traffic control during concreting operations. Around 150 cubic metres of pumped ready mixed concrete was moved up to 200 metres each day. A Pact system paver will be used to slipform the concrete track bases.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The article describes the removal of extensive sections of brick invert along the London city line tunnel between Kings Cross and Farrington to increase clearances for operating British Rail electric services into Moorgate. The extreme caution exercised in the removal of about 200 separate breakouts which were made at six locations is emphasized. A Krupp 200 breaker was used for the work, the brickwork being replaced by reinforced concrete. Reference is made to traffic control during concreting operations. Around 150 cubic metres of pumped ready mixed concrete was moved up to 200 metres each day. A Pact system paver will be used to slipform the concrete track bases.

Key concepts: Brickwork, Engineering, Brick, Forensic engineering, Track (disk drive), Reinforced concrete, Prestressed concrete, Civil engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
CITY RAIL LINK SQUEEZES INTO OLD TUNNEL — Research Paper | ScholarLens