CITY RAIL LINK SQUEEZES INTO OLD TUNNEL
M Winney
Abstract
M Winney
Abstract
The article describes the removal of extensive sections of brick invert along the London city line tunnel between Kings Cross and Farrington to increase clearances for operating British Rail electric services into Moorgate. The extreme caution exercised in the removal of about 200 separate breakouts which were made at six locations is emphasized. A Krupp 200 breaker was used for the work, the brickwork being replaced by reinforced concrete. Reference is made to traffic control during concreting operations. Around 150 cubic metres of pumped ready mixed concrete was moved up to 200 metres each day. A Pact system paver will be used to slipform the concrete track bases.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The article describes the removal of extensive sections of brick invert along the London city line tunnel between Kings Cross and Farrington to increase clearances for operating British Rail electric services into Moorgate. The extreme caution exercised in the removal of about 200 separate breakouts which were made at six locations is emphasized. A Krupp 200 breaker was used for the work, the brickwork being replaced by reinforced concrete. Reference is made to traffic control during concreting operations. Around 150 cubic metres of pumped ready mixed concrete was moved up to 200 metres each day. A Pact system paver will be used to slipform the concrete track bases.
Key concepts: Brickwork, Engineering, Brick, Forensic engineering, Track (disk drive), Reinforced concrete, Prestressed concrete, Civil engineering