CONTROL OF SHORT-TERM PROJECTS
J Diamante
Abstract
J Diamante
Abstract
THIS PAPER WAS PRESENTED AT THE 39TH ANNUAL MEETING OF THE IBTTA. IT DEALS WITH THE OPERATIONAL CONTROL OF A TOLL MOTORWAY FROM THE POINT OF VIEW OF ACTUALIZED COST AND IMPROVEMENT OF CONDITIONS FOR THE COMMUNITY. ATTENTION IS DRAWN TO THE USELESSNESS OF TRADITIONAL ACCOUNTANCY TECHNIQUES. DETAILS ARE GIVEN OF THE METHODS USED IN SPAIN IN THE FIELD OF TOLL ROAD EXPLOITATION BY CONCESSIONARY FIRMS. THIS PAPER IS IN SPANISH.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
THIS PAPER WAS PRESENTED AT THE 39TH ANNUAL MEETING OF THE IBTTA. IT DEALS WITH THE OPERATIONAL CONTROL OF A TOLL MOTORWAY FROM THE POINT OF VIEW OF ACTUALIZED COST AND IMPROVEMENT OF CONDITIONS FOR THE COMMUNITY. ATTENTION IS DRAWN TO THE USELESSNESS OF TRADITIONAL ACCOUNTANCY TECHNIQUES. DETAILS ARE GIVEN OF THE METHODS USED IN SPAIN IN THE FIELD OF TOLL ROAD EXPLOITATION BY CONCESSIONARY FIRMS. THIS PAPER IS IN SPANISH.
Key concepts: Toll, Control (management), Term (time), Field (mathematics), Point (geometry), Business, Operations management, Engineering