Keeping Control over the Commissioning of Large, Complex Projects with the Help of a Management Database

Sascha Bogatka, Harald Steidi

Open publisher page 0 citations

Abstract

The Gotthard Base Tunnel is a key component in the new railway link through the Alps like the Lotschberg Base Tunnel which has already entered service. The Swiss people first voted in favor of the project in 1992. The intention of this project is for efficient, high-capacity railway lines to attract transit traffic off the roads and onto the rails and also to protect the Alps and other people who live in the region from further ecological harm. The Gotthard Base Tunnel is 57 km long, which is one of the factors that makes commissioning of the tunnel a difficult undertaking. However, effective control over the commissioning operation can be achieved by applying a management database. Commissioning can be understood as the link between the design of the project and the engineering work on the one hand, and the operation of the entire installation on the other hand. Experience gained from the Lotschberg tunnel is being applied with numerous technical system components to ensure that the trains run safely through the tunnel.

About this research paper

What this paper is about

The Gotthard Base Tunnel is a key component in the new railway link through the Alps like the Lotschberg Base Tunnel which has already entered service. The Swiss people first voted in favor of the project in 1992. The intention of this project is for efficient, high-capacity railway lines to attract transit traffic off the roads and onto the rails and also to protect the Alps and other people who live in the region from further ecological harm. The Gotthard Base Tunnel is 57 km long, which is one of the factors that makes commissioning of the tunnel a difficult undertaking. However, effective control over the commissioning operation can be achieved by applying a management database. Commissioning can be understood as the link between the design of the project and the engineering work on the one hand, and the operation of the entire installation on the other hand. Experience gained from the Lotschberg tunnel is being applied with numerous technical system components to ensure that the trains run safely through the tunnel.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The Gotthard Base Tunnel is a key component in the new railway link through the Alps like the Lotschberg Base Tunnel which has already entered service. The Swiss people first voted in favor of the project in 1992. The intention of this project is for efficient, high-capacity railway lines to attract transit traffic off the roads and onto the rails and also to protect the Alps and other people who live in the region from further ecological harm. The Gotthard Base Tunnel is 57 km long, which is one of the factors that makes commissioning of the tunnel a difficult undertaking. However, effective control over the commissioning operation can be achieved by applying a management database. Commissioning can be understood as the link between the design of the project and the engineering work on the one hand, and the operation of the entire installation on the other hand. Experience gained from the Lotschberg tunnel is being applied with numerous technical system components to ensure that the trains run safely through the tunnel.

Key concepts: Project commissioning, Train, Work (physics), Component (thermodynamics), Engineering, Harm, Key (lock), Transport engineering