THE CONSTRUCTION OF A CENTRALIZED CONTROL SYSTEM FOR TRAFFIC SIGNALS WITH AN EXPLANATION OF THE USE OF THE CONTROL MODEL "VEHICLE ACTUATED AREA CONTROL" IN OBERHAUSEN

Hauke Heier

Open publisher page 0 citations

Abstract

The large growth in inner city traffic and the occasional sudden additional loading of city streets from non-local traffic made it necessary in Oberhausen-a Ruhr City with one quarter of a million inhabitants and a road network of 440 km - to renew the ageing traffic signal network in the old area of the city. A part area traffic control technique was chosen, which is a combination of area traffic control and other control. The control equipment is organised by switch-technology into phase-groups. In connection with an overriding area traffic control unit this system offers the possibility of determining at will the phase-sequence, the phase duration and a time-related grading of desirable routes. A detailed description is given of the construction of the installation carried out by the signal construction Huber-Designa GMBH of Munich. Area traffic control is carried out using two synchronised hp 2100a processing computers. There is a total of 290 detectors connected to the system. The following are used as parameters: number of vehicles, traffic flow, traffic density, time lapse, presence (requirement), duration of occupation (tail backs), degree of occupation, speed. Tracon was the adopted program system, which is easy to understand and permits the traffic engineer with only a brief introduction and without prior knowledge of the program language to make changes and new traffic situations in the program language. An extension of the signal system to the remaining areas of the city is anticipated. (TRRL)

About this research paper

What this paper is about

The large growth in inner city traffic and the occasional sudden additional loading of city streets from non-local traffic made it necessary in Oberhausen-a Ruhr City with one quarter of a million inhabitants and a road network of 440 km - to renew the ageing traffic signal network in the old area of the city. A part area traffic control technique was chosen, which is a combination of area traffic control and other control. The control equipment is organised by switch-technology into phase-groups. In connection with an overriding area traffic control unit this system offers the possibility of determining at will the phase-sequence, the phase duration and a time-related grading of desirable routes. A detailed description is given of the construction of the installation carried out by the signal construction Huber-Designa GMBH of Munich. Area traffic control is carried out using two synchronised hp 2100a processing computers. There is a total of 290 detectors connected to the system. The following are used as parameters: number of vehicles, traffic flow, traffic density, time lapse, presence (requirement), duration of occupation (tail backs), degree of occupation, speed. Tracon was the adopted program system, which is easy to understand and permits the traffic engineer with only a brief introduction and without prior knowledge of the program language to make changes and new traffic situations in the program language. An extension of the signal system to the remaining areas of the city is anticipated. (TRRL)

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The large growth in inner city traffic and the occasional sudden additional loading of city streets from non-local traffic made it necessary in Oberhausen-a Ruhr City with one quarter of a million inhabitants and a road network of 440 km - to renew the ageing traffic signal network in the old area of the city. A part area traffic control technique was chosen, which is a combination of area traffic control and other control. The control equipment is organised by switch-technology into phase-groups. In connection with an overriding area traffic control unit this system offers the possibility of determining at will the phase-sequence, the phase duration and a time-related grading of desirable routes. A detailed description is given of the construction of the installation carried out by the signal construction Huber-Designa GMBH of Munich. Area traffic control is carried out using two synchronised hp 2100a processing computers. There is a total of 290 detectors connected to the system. The following are used as parameters: number of vehicles, traffic flow, traffic density, time lapse, presence (requirement), duration of occupation (tail backs), degree of occupation, speed. Tracon was the adopted program system, which is easy to understand and permits the traffic engineer with only a brief introduction and without prior knowledge of the program language to make changes and new traffic situations in the program language. An extension of the signal system to the remaining areas of the city is anticipated. (TRRL)

Key concepts: Transport engineering, Engineering, Control system, Control (management), Traffic flow (computer networking), Computer science, Computer network, Electrical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
THE CONSTRUCTION OF A CENTRALIZED CONTROL SYSTEM FOR TRAFFIC SIGNALS WITH AN EXPLANATION OF THE USE OF THE CONTROL MODEL "VEHICLE ACTUATED AREA CONTROL" IN OBERHAUSEN — Research Paper | ScholarLens