1975Unpublished venueRequires access

THE EVALUATION OF THE SHIRLEY HIGHWAY EXPRESS-BUS-ON-FREEWAY DEMONSTRATION PROJECT

James T McQueen, D M Levinsohm, R Waksman, Gerald K Miller

Open publisher page 2 citations

Abstract

The primary goal of the project was to demonstrate that express bus-on-freeway operations can improve the quality of bus service and lead to an increase in the people moving capability of peak period transportation facilities for an entire urban corridor. Other project goals were to demonstrate the effectiveness of this technology as a means of reducing auto pollutant emissions and gasoline consumption, improving the mobility of the transportation disadvantaged and the economic condition of the transit operator. An analysis of bus operations is presented which shows that the project effected an improvement in the quality of the Corridor bus service, evidenced by the reduction in travel times by bus, and the increase in both the reliability and the coverage of the bus system.

About this research paper

What this paper is about

The primary goal of the project was to demonstrate that express bus-on-freeway operations can improve the quality of bus service and lead to an increase in the people moving capability of peak period transportation facilities for an entire urban corridor. Other project goals were to demonstrate the effectiveness of this technology as a means of reducing auto pollutant emissions and gasoline consumption, improving the mobility of the transportation disadvantaged and the economic condition of the transit operator. An analysis of bus operations is presented which shows that the project effected an improvement in the quality of the Corridor bus service, evidenced by the reduction in travel times by bus, and the increase in both the reliability and the coverage of the bus system.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The primary goal of the project was to demonstrate that express bus-on-freeway operations can improve the quality of bus service and lead to an increase in the people moving capability of peak period transportation facilities for an entire urban corridor. Other project goals were to demonstrate the effectiveness of this technology as a means of reducing auto pollutant emissions and gasoline consumption, improving the mobility of the transportation disadvantaged and the economic condition of the transit operator. An analysis of bus operations is presented which shows that the project effected an improvement in the quality of the Corridor bus service, evidenced by the reduction in travel times by bus, and the increase in both the reliability and the coverage of the bus system.

Key concepts: Transport engineering, Bus rapid transit, Service (business), Reliability (semiconductor), Public transport, Transit (satellite), Quality (philosophy), Automotive engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
THE EVALUATION OF THE SHIRLEY HIGHWAY EXPRESS-BUS-ON-FREEWAY DEMONSTRATION PROJECT — Research Paper | ScholarLens