Abstract

Due to increased traffic volume and congestion, conflicting movements, and capacity limitations, two roundabouts have been constructed by converting the existing signalized intersection in the north and stop controlled intersections in the south side on South Lamar Boulevard and Mississippi (MS) Highway 6 Interchange in Oxford, MS. The overall objective of this study was to assess the performance of the roundabouts in Oxford with respect to traffic flow, capacity, safety improvements, and a public opinion survey. Detailed post-roundabout traffic movement volume and crash data were collected and compared with the pre-roundabout data to assess the in-service performance of these roundabouts. The results of the Oxford roundabout study showed significant improvement in traffic flow, crash reduction, and reduction in vehicle emissions. It was found that the conversion of the intersections to roundabouts improved traffic flow by reducing average delay by 24%, idling time by 77%, and fuel wastage by 56%. Overall vehicle emissions from idling were reduced significantly. The roundabout conversion increased the mean speed on the South Lamar interchange by 67% and improved level of service for both roundabouts. The roundabout junctions improved safety performance through: a 37.5% reduction in crashes and a 60% reduction in the number of crashes resulting in injury. The reduction in overall crashes in the study area reduced comprehensive cost by 54.4%. Additional user cost savings of $806,071 were calculated annually from reductions in travel time and fuel wastage. These benefits paid off the total construction cost of the roundabouts within two years. The anonymous public opinion survey overwhelmingly shows favorable results and provides support to build more roundabout junctions in place of stop-controlled intersections. The study results indicate that roundabouts are performing well as intended. It is a preferable solution to improve capacity and safety compared to signal control and stop controlled intersections.

About this research paper

What this paper is about

Due to increased traffic volume and congestion, conflicting movements, and capacity limitations, two roundabouts have been constructed by converting the existing signalized intersection in the north and stop controlled intersections in the south side on South Lamar Boulevard and Mississippi (MS) Highway 6 Interchange in Oxford, MS. The overall objective of this study was to assess the performance of the roundabouts in Oxford with respect to traffic flow, capacity, safety improvements, and a public opinion survey. Detailed post-roundabout traffic movement volume and crash data were collected and compared with the pre-roundabout data to assess the in-service performance of these roundabouts. The results of the Oxford roundabout study showed significant improvement in traffic flow, crash reduction, and reduction in vehicle emissions. It was found that the conversion of the intersections to roundabouts improved traffic flow by reducing average delay by 24%, idling time by 77%, and fuel wastage by 56%. Overall vehicle emissions from idling were reduced significantly. The roundabout conversion increased the mean speed on the South Lamar interchange by 67% and improved level of service for both roundabouts. The roundabout junctions improved safety performance through: a 37.5% reduction in crashes and a 60% reduction in the number of crashes resulting in injury. The reduction in overall crashes in the study area reduced comprehensive cost by 54.4%. Additional user cost savings of $806,071 were calculated annually from reductions in travel time and fuel wastage. These benefits paid off the total construction cost of the roundabouts within two years. The anonymous public opinion survey overwhelmingly shows favorable results and provides support to build more roundabout junctions in place of stop-controlled intersections. The study results indicate that roundabouts are performing well as intended. It is a preferable solution to improve capacity and safety compared to signal control and stop controlled intersections.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Due to increased traffic volume and congestion, conflicting movements, and capacity limitations, two roundabouts have been constructed by converting the existing signalized intersection in the north and stop controlled intersections in the south side on South Lamar Boulevard and Mississippi (MS) Highway 6 Interchange in Oxford, MS. The overall objective of this study was to assess the performance of the roundabouts in Oxford with respect to traffic flow, capacity, safety improvements, and a public opinion survey. Detailed post-roundabout traffic movement volume and crash data were collected and compared with the pre-roundabout data to assess the in-service performance of these roundabouts. The results of the Oxford roundabout study showed significant improvement in traffic flow, crash reduction, and reduction in vehicle emissions. It was found that the conversion of the intersections to roundabouts improved traffic flow by reducing average delay by 24%, idling time by 77%, and fuel wastage by 56%. Overall vehicle emissions from idling were reduced significantly. The roundabout conversion increased the mean speed on the South Lamar interchange by 67% and improved level of service for both roundabouts. The roundabout junctions improved safety performance through: a 37.5% reduction in crashes and a 60% reduction in the number of crashes resulting in injury. The reduction in overall crashes in the study area reduced comprehensive cost by 54.4%. Additional user cost savings of $806,071 were calculated annually from reductions in travel time and fuel wastage. These benefits paid off the total construction cost of the roundabouts within two years. The anonymous public opinion survey overwhelmingly shows favorable results and provides support to build more roundabout junctions in place of stop-controlled intersections. The study results indicate that roundabouts are performing well as intended. It is a preferable solution to improve capacity and safety compared to signal control and stop controlled intersections.

Key concepts: Roundabout, Transport engineering, Level of service, Crash, Traffic flow (computer networking), Traffic volume, Traffic speed, Intersection (aeronautics)