Nuernberg-Muenchen high speed line

E Fricke, Wolfgang Feldwisch

Open publisher page 0 citations

Abstract

This article details the construction procedures and engineering features of a new-build and upgrading project on the railway line between Nuernberg and Muenchen, Germany. This line plays a large part in the Netz 21 railway reform strategy to improve the railway network to make it more competitive and cost-efficient. It should enable reduced journey times and the segregation of fast trains. Construction contracts were awarded to a single general contractor. Engineering structures noted here are tunnels, some of which have required complex earthworks to prevent soil or rock movement; bridges; and slabtrack, in three different systems. Command and control systems include electronic signalling installations and automatic train control.

About this research paper

What this paper is about

This article details the construction procedures and engineering features of a new-build and upgrading project on the railway line between Nuernberg and Muenchen, Germany. This line plays a large part in the Netz 21 railway reform strategy to improve the railway network to make it more competitive and cost-efficient. It should enable reduced journey times and the segregation of fast trains. Construction contracts were awarded to a single general contractor. Engineering structures noted here are tunnels, some of which have required complex earthworks to prevent soil or rock movement; bridges; and slabtrack, in three different systems. Command and control systems include electronic signalling installations and automatic train control.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This article details the construction procedures and engineering features of a new-build and upgrading project on the railway line between Nuernberg and Muenchen, Germany. This line plays a large part in the Netz 21 railway reform strategy to improve the railway network to make it more competitive and cost-efficient. It should enable reduced journey times and the segregation of fast trains. Construction contracts were awarded to a single general contractor. Engineering structures noted here are tunnels, some of which have required complex earthworks to prevent soil or rock movement; bridges; and slabtrack, in three different systems. Command and control systems include electronic signalling installations and automatic train control.

Key concepts: Earthworks, Railway line, Engineering, Train, Line (geometry), Civil engineering, Rail network, Transport engineering