THE DOCKLANDS LIGHT RAPID TRANSIT SCHEME
Jeannette Glover
Abstract
Jeannette Glover
Abstract
As part of London docklands Development Corp. urban renewal of 8 sq mi of Thames waterfront areas of east London, a light rail transit system will be built. The 8 miles of routes that will be built in the L77-million first phase are to open in 1987, utilizing active and abandoned railroad rights-of-way and new alignments in certain areas. There will be inter-changes with both London Transport and British Railways services. The light rail vehicles will be capable of train operation in peak periods. Ultimately capacity of 8,000 riders per hour will be provided; a third branch from the authorized Y-shaped system may also be built.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
As part of London docklands Development Corp. urban renewal of 8 sq mi of Thames waterfront areas of east London, a light rail transit system will be built. The 8 miles of routes that will be built in the L77-million first phase are to open in 1987, utilizing active and abandoned railroad rights-of-way and new alignments in certain areas. There will be inter-changes with both London Transport and British Railways services. The light rail vehicles will be capable of train operation in peak periods. Ultimately capacity of 8,000 riders per hour will be provided; a third branch from the authorized Y-shaped system may also be built.
Key concepts: Light rail, Light rail transit, Transport engineering, Transit (satellite), Passenger transport, Public transport, Rail transit, Engineering