2010Routes/RoadsRequires access

Distribution of De-Icing Salts on the Road Surface

G Hausmann, Horst Badelt

Open publisher page 0 citations

Abstract

This article reports on a two-year study (2006 to 2008) of the distribution of de-icing salts (NaCl) applied to the road and the influence of traffic on the effective times of the de-icing salts. The research was focused on the needed resting periods of de-icing salts on road surfaces. The study used sensors installed in two lanes of the Motorway A4 in the area of the Dresden-Hellerau Highway Surveillance Center (Germany), to measure air and ground temperatures, wind speed and direction, liquid film thicknesses and residual quantities of salt on the road surface during ongoing traffic at 5-minute intervals. The authors conclude with four observations that can be useful for applying de-icing salts more judiciously: preventive spreading is only sensible if applied timely, i.e. immediately prior to icing events to be expected; the time-frame for preventive spreading on the dry road surface is maximum 60 minutes and on the moist road surface maximum 120 minutes; by increasing spreading densities in preventive spreading, this timeframe cannot be extended; it is completely sufficient if the spreading width is adjusted in such a way that the outer wheel tracks are also covered by the spreading. Distribution across the entire width of the lane will be caused by the rolling traffic within a few minutes.

About this research paper

What this paper is about

This article reports on a two-year study (2006 to 2008) of the distribution of de-icing salts (NaCl) applied to the road and the influence of traffic on the effective times of the de-icing salts. The research was focused on the needed resting periods of de-icing salts on road surfaces. The study used sensors installed in two lanes of the Motorway A4 in the area of the Dresden-Hellerau Highway Surveillance Center (Germany), to measure air and ground temperatures, wind speed and direction, liquid film thicknesses and residual quantities of salt on the road surface during ongoing traffic at 5-minute intervals. The authors conclude with four observations that can be useful for applying de-icing salts more judiciously: preventive spreading is only sensible if applied timely, i.e. immediately prior to icing events to be expected; the time-frame for preventive spreading on the dry road surface is maximum 60 minutes and on the moist road surface maximum 120 minutes; by increasing spreading densities in preventive spreading, this timeframe cannot be extended; it is completely sufficient if the spreading width is adjusted in such a way that the outer wheel tracks are also covered by the spreading. Distribution across the entire width of the lane will be caused by the rolling traffic within a few minutes.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This article reports on a two-year study (2006 to 2008) of the distribution of de-icing salts (NaCl) applied to the road and the influence of traffic on the effective times of the de-icing salts. The research was focused on the needed resting periods of de-icing salts on road surfaces. The study used sensors installed in two lanes of the Motorway A4 in the area of the Dresden-Hellerau Highway Surveillance Center (Germany), to measure air and ground temperatures, wind speed and direction, liquid film thicknesses and residual quantities of salt on the road surface during ongoing traffic at 5-minute intervals. The authors conclude with four observations that can be useful for applying de-icing salts more judiciously: preventive spreading is only sensible if applied timely, i.e. immediately prior to icing events to be expected; the time-frame for preventive spreading on the dry road surface is maximum 60 minutes and on the moist road surface maximum 120 minutes; by increasing spreading densities in preventive spreading, this timeframe cannot be extended; it is completely sufficient if the spreading width is adjusted in such a way that the outer wheel tracks are also covered by the spreading. Distribution across the entire width of the lane will be caused by the rolling traffic within a few minutes.

Key concepts: Icing, Road surface, Environmental science, Meteorology, Wind speed, Wind tunnel, Wind direction, Salt (chemistry)

Related papers

Back to paper searchBrowse research topicsOriginal source
Distribution of De-Icing Salts on the Road Surface — Research Paper | ScholarLens