2011Transportation Research Board 90th Annual MeetingTransportation Research BoardRequires access

Vehicle Speeds in Work Zones: An Objective and Subjective Analysis

Mojtaba Ale Mohammadi, Ghulam H. Bham

Open publisher page 3 citations

Abstract

This study examined quantitatively and qualitatively the speed characteristics and drivers’ compliance with the posted speed limit using objective and subjective data analysis, respectively. Nine data sets from different configurations of four work zones on I-44 in Missouri were used for the objective evaluation. Parametric statistical tests were performed for the evaluation of the speeds of cars and trucks. The effects of lane closure, lane width reduction, and construction activity on speeds of vehicles were studied. Construction activity had a significant effect in reducing the speeds of vehicles. Results indicated that the speeds of vehicles were statistically higher than the posted speed limit for most cases except when lane width was reduced using tubular markers inside the open lane. The subjective evaluation investigated the drivers' perception of driving through the work zones by using a survey questionnaire. Specific questions were related to safety, drivers’ preference for different signage distances before the work zone, drivers’ actual speed versus posted speed limit and compliance, delay in work zones, and the effect of construction activity on their speeds. Results were consistent with the objective evaluation and showed that the drivers prefer to be well informed more than a mile from the work zone. More than 87% of drivers moved out of the closed lane before they could actually see the work zone. More than 60% of drivers experienced delay and 92% agreed that construction activity reduced their speeds which were also found from the results of the objective analysis.

About this research paper

What this paper is about

This study examined quantitatively and qualitatively the speed characteristics and drivers’ compliance with the posted speed limit using objective and subjective data analysis, respectively. Nine data sets from different configurations of four work zones on I-44 in Missouri were used for the objective evaluation. Parametric statistical tests were performed for the evaluation of the speeds of cars and trucks. The effects of lane closure, lane width reduction, and construction activity on speeds of vehicles were studied. Construction activity had a significant effect in reducing the speeds of vehicles. Results indicated that the speeds of vehicles were statistically higher than the posted speed limit for most cases except when lane width was reduced using tubular markers inside the open lane. The subjective evaluation investigated the drivers' perception of driving through the work zones by using a survey questionnaire. Specific questions were related to safety, drivers’ preference for different signage distances before the work zone, drivers’ actual speed versus posted speed limit and compliance, delay in work zones, and the effect of construction activity on their speeds. Results were consistent with the objective evaluation and showed that the drivers prefer to be well informed more than a mile from the work zone. More than 87% of drivers moved out of the closed lane before they could actually see the work zone. More than 60% of drivers experienced delay and 92% agreed that construction activity reduced their speeds which were also found from the results of the objective analysis.

Why it matters

OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This study examined quantitatively and qualitatively the speed characteristics and drivers’ compliance with the posted speed limit using objective and subjective data analysis, respectively. Nine data sets from different configurations of four work zones on I-44 in Missouri were used for the objective evaluation. Parametric statistical tests were performed for the evaluation of the speeds of cars and trucks. The effects of lane closure, lane width reduction, and construction activity on speeds of vehicles were studied. Construction activity had a significant effect in reducing the speeds of vehicles. Results indicated that the speeds of vehicles were statistically higher than the posted speed limit for most cases except when lane width was reduced using tubular markers inside the open lane. The subjective evaluation investigated the drivers' perception of driving through the work zones by using a survey questionnaire. Specific questions were related to safety, drivers’ preference for different signage distances before the work zone, drivers’ actual speed versus posted speed limit and compliance, delay in work zones, and the effect of construction activity on their speeds. Results were consistent with the objective evaluation and showed that the drivers prefer to be well informed more than a mile from the work zone. More than 87% of drivers moved out of the closed lane before they could actually see the work zone. More than 60% of drivers experienced delay and 92% agreed that construction activity reduced their speeds which were also found from the results of the objective analysis.

Key concepts: Speed limit, Signage, Work (physics), Work zone, Truck, Transport engineering, Mile, Computer science

Related papers

Back to paper searchBrowse research topicsOriginal source
Vehicle Speeds in Work Zones: An Objective and Subjective Analysis — Research Paper | ScholarLens