2012International Conference on Electric Technology and Civil EngineeringRequires access

Bored Pile with Pile-End Pressure Grouting Technology and Supporting Capacity Analysis

Yuqin Feng, Lu Zhang, Yinghao Wang

Open publisher page 0 citations

Abstract

Bored Pile with pile-end pressure grouting technology has been widely used in high-rise buildings and large public buildings in China's Inner Mongolia region. Due to this bored pile take a osmosis, filled, replacement, consolidation and consolidation effect, it could have a special role on eliminating the dregs at the pile bottom and the holes hidden trouble between the pile soil and it also enhance the strength of the pile body, increasing the binding power of pile and the soil between the piles. With the result of that, the supporting capacity has a significantly improved and this technology has become the advanced scientific method of reducing the settlement of the pile foundation. By using a high-rise building projects pile example that takes bored piles with pile-end pressure grouting and static loading test, observations and determine the settlement value of the single vertical design capacity analysis methods, it shows that the pile-end pressure grouting bored piles, the layer of sand mixed capacity has been significantly improved.

About this research paper

What this paper is about

Bored Pile with pile-end pressure grouting technology has been widely used in high-rise buildings and large public buildings in China's Inner Mongolia region. Due to this bored pile take a osmosis, filled, replacement, consolidation and consolidation effect, it could have a special role on eliminating the dregs at the pile bottom and the holes hidden trouble between the pile soil and it also enhance the strength of the pile body, increasing the binding power of pile and the soil between the piles. With the result of that, the supporting capacity has a significantly improved and this technology has become the advanced scientific method of reducing the settlement of the pile foundation. By using a high-rise building projects pile example that takes bored piles with pile-end pressure grouting and static loading test, observations and determine the settlement value of the single vertical design capacity analysis methods, it shows that the pile-end pressure grouting bored piles, the layer of sand mixed capacity has been significantly improved.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Bored Pile with pile-end pressure grouting technology has been widely used in high-rise buildings and large public buildings in China's Inner Mongolia region. Due to this bored pile take a osmosis, filled, replacement, consolidation and consolidation effect, it could have a special role on eliminating the dregs at the pile bottom and the holes hidden trouble between the pile soil and it also enhance the strength of the pile body, increasing the binding power of pile and the soil between the piles. With the result of that, the supporting capacity has a significantly improved and this technology has become the advanced scientific method of reducing the settlement of the pile foundation. By using a high-rise building projects pile example that takes bored piles with pile-end pressure grouting and static loading test, observations and determine the settlement value of the single vertical design capacity analysis methods, it shows that the pile-end pressure grouting bored piles, the layer of sand mixed capacity has been significantly improved.

Key concepts: Pile, Consolidation (business), Geotechnical engineering, Settlement (finance), Bearing capacity, Engineering, Pile cap, Foundation (evidence)

Related papers

Back to paper searchBrowse research topicsOriginal source
Bored Pile with Pile-End Pressure Grouting Technology and Supporting Capacity Analysis — Research Paper | ScholarLens