The Effectiveness Of Using Column Formwork In A Multi-Story Building Construction Project

Muhammad Lawdy Dhiyaa Vansya, Eva Arifi, Ming Narto Wijaya

Open full text 0 citations

Abstract

Building the structural components is crucial for constructing a multi-story building. In the process of creating these components, which is commonly done through casting, a tool called formwork is required. Formwork is a tool used to mold the necessary concrete structures, ensuring that their shape and dimensions align with the concrete material's planning. Formwork tasks for concrete work significantly impact costs. Different formwork options, including traditional, semi-system, and full-system forms, are available. This research aims to assess cost-effectiveness through value engineering, specifically focusing on column formwork, by comparing their utilization in a multi-story construction project. The study begins by collecting primary data, namely working drawings, so that the volume of conventional formwork can be calculated. Then, budget planning calculations are made to analyze the cost comparison of each formwork alternative. The selection of the appropriate formwork affects the speed of execution and the costs incurredIn this construction project for the building, the conventional column formwork results in expenses amounting to IDR 587,749,263.04 and requires 28 days for completion, while semi-system column formwork achieves a 37% cost saving with the same duration of 28 days, and full-system column formwork becomes 64% more cost-effective with a construction period of 10 days.

Open-access reader

About this research paper

What this paper is about

Building the structural components is crucial for constructing a multi-story building. In the process of creating these components, which is commonly done through casting, a tool called formwork is required. Formwork is a tool used to mold the necessary concrete structures, ensuring that their shape and dimensions align with the concrete material's planning. Formwork tasks for concrete work significantly impact costs. Different formwork options, including traditional, semi-system, and full-system forms, are available. This research aims to assess cost-effectiveness through value engineering, specifically focusing on column formwork, by comparing their utilization in a multi-story construction project. The study begins by collecting primary data, namely working drawings, so that the volume of conventional formwork can be calculated. Then, budget planning calculations are made to analyze the cost comparison of each formwork alternative. The selection of the appropriate formwork affects the speed of execution and the costs incurredIn this construction project for the building, the conventional column formwork results in expenses amounting to IDR 587,749,263.04 and requires 28 days for completion, while semi-system column formwork achieves a 37% cost saving with the same duration of 28 days, and full-system column formwork becomes 64% more cost-effective with a construction period of 10 days.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Building the structural components is crucial for constructing a multi-story building. In the process of creating these components, which is commonly done through casting, a tool called formwork is required. Formwork is a tool used to mold the necessary concrete structures, ensuring that their shape and dimensions align with the concrete material's planning. Formwork tasks for concrete work significantly impact costs. Different formwork options, including traditional, semi-system, and full-system forms, are available. This research aims to assess cost-effectiveness through value engineering, specifically focusing on column formwork, by comparing their utilization in a multi-story construction project. The study begins by collecting primary data, namely working drawings, so that the volume of conventional formwork can be calculated. Then, budget planning calculations are made to analyze the cost comparison of each formwork alternative. The selection of the appropriate formwork affects the speed of execution and the costs incurredIn this construction project for the building, the conventional column formwork results in expenses amounting to IDR 587,749,263.04 and requires 28 days for completion, while semi-system column formwork achieves a 37% cost saving with the same duration of 28 days, and full-system column formwork becomes 64% more cost-effective with a construction period of 10 days.

Key concepts: Formwork, Column (typography), Building construction, Engineering, Process (computing), Plan (archaeology), Construction engineering, Civil engineering