An Innovative Solution to Regain Well Integrity and Deepening Gas Injection Point - Maximizing Production and Rectifying Multiple Tubing Leaks with a Low-Cost Solution

Muhamad Aasif Mamat, Sirag Al Zayani, M. Alham, M. Alham M. Johan, Masran Kadir, Saim Rahman, Chidi Ogueri, Kelvin Thian, N. Zafuan, Ali Abdul Hamid, Budi Kastulani Zamudin, Akram Arifin, Y. Peng Low

Open publisher page 2 citations

Abstract

Abstract Multiple tubing leaks have become one of the major issues in brownfield operations especially on wells that have already exceeded their original production lifetimes. This integrity issue becomes more challenging when the leaks occur close to the tubing hanger due to the space constraints in fixing them. In addition, high water cut wells with low reservoir pressure require continuous artificial lift where tubing integrity is crucial to allow the injected gas reach to the target injection depth. Conventionally, tubing packoffis used to isolate tubing leaks occurring in short intervals while longer ones require coiled tubing straddle with higher installation complexity. However, some wells need deeper injection than the initial completion design. The wells might not be able to flow efficiently without deepening the gas lift point to optimize production to the full extent. In finding the solution to all three issues; multiple tubing leaks, low reservoir pressure and the requirement for deeper gas lift point, multiple solutions have been proposed and evaluated. Traditionally, workover is considered the best method to replace degraded tubing and to deepen gas lift mandrels. This paper discusses an innovative and low-cost solution which has been proposed and successfully executed in a dual strings completion. A conventional coiled tubing straddle is installed in the long string as Coiled Tubing Gas Injection Straddle (CTGIS) for gas lifting and the short string is used for oil production. This system replicates the barrier envelope as per the production casing annulus during gas lifting operations and also deepens the lifting point through a sliding sleeves door (SSD). Injected gas mixes with liquid through the SSD from the long string allowing continuous flow from the short string. This low-cost and quick solution enables the well to be restored to production. This paper includes the gas injection straddle system that consists of engineering design, installation and testing, resulting in a two-fold incremental increase in the production rate and costing only one-tenth of recompleting the well. This has increased the chance of success to restore most idle wells with tubing leaks and opens the door to enhance the existing production.

About this research paper

What this paper is about

Abstract Multiple tubing leaks have become one of the major issues in brownfield operations especially on wells that have already exceeded their original production lifetimes. This integrity issue becomes more challenging when the leaks occur close to the tubing hanger due to the space constraints in fixing them. In addition, high water cut wells with low reservoir pressure require continuous artificial lift where tubing integrity is crucial to allow the injected gas reach to the target injection depth. Conventionally, tubing packoffis used to isolate tubing leaks occurring in short intervals while longer ones require coiled tubing straddle with higher installation complexity. However, some wells need deeper injection than the initial completion design. The wells might not be able to flow efficiently without deepening the gas lift point to optimize production to the full extent. In finding the solution to all three issues; multiple tubing leaks, low reservoir pressure and the requirement for deeper gas lift point, multiple solutions have been proposed and evaluated. Traditionally, workover is considered the best method to replace degraded tubing and to deepen gas lift mandrels. This paper discusses an innovative and low-cost solution which has been proposed and successfully executed in a dual strings completion. A conventional coiled tubing straddle is installed in the long string as Coiled Tubing Gas Injection Straddle (CTGIS) for gas lifting and the short string is used for oil production. This system replicates the barrier envelope as per the production casing annulus during gas lifting operations and also deepens the lifting point through a sliding sleeves door (SSD). Injected gas mixes with liquid through the SSD from the long string allowing continuous flow from the short string. This low-cost and quick solution enables the well to be restored to production. This paper includes the gas injection straddle system that consists of engineering design, installation and testing, resulting in a two-fold incremental increase in the production rate and costing only one-tenth of recompleting the well. This has increased the chance of success to restore most idle wells with tubing leaks and opens the door to enhance the existing production.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Abstract Multiple tubing leaks have become one of the major issues in brownfield operations especially on wells that have already exceeded their original production lifetimes. This integrity issue becomes more challenging when the leaks occur close to the tubing hanger due to the space constraints in fixing them. In addition, high water cut wells with low reservoir pressure require continuous artificial lift where tubing integrity is crucial to allow the injected gas reach to the target injection depth. Conventionally, tubing packoffis used to isolate tubing leaks occurring in short intervals while longer ones require coiled tubing straddle with higher installation complexity. However, some wells need deeper injection than the initial completion design. The wells might not be able to flow efficiently without deepening the gas lift point to optimize production to the full extent. In finding the solution to all three issues; multiple tubing leaks, low reservoir pressure and the requirement for deeper gas lift point, multiple solutions have been proposed and evaluated. Traditionally, workover is considered the best method to replace degraded tubing and to deepen gas lift mandrels. This paper discusses an innovative and low-cost solution which has been proposed and successfully executed in a dual strings completion. A conventional coiled tubing straddle is installed in the long string as Coiled Tubing Gas Injection Straddle (CTGIS) for gas lifting and the short string is used for oil production. This system replicates the barrier envelope as per the production casing annulus during gas lifting operations and also deepens the lifting point through a sliding sleeves door (SSD). Injected gas mixes with liquid through the SSD from the long string allowing continuous flow from the short string. This low-cost and quick solution enables the well to be restored to production. This paper includes the gas injection straddle system that consists of engineering design, installation and testing, resulting in a two-fold incremental increase in the production rate and costing only one-tenth of recompleting the well. This has increased the chance of success to restore most idle wells with tubing leaks and opens the door to enhance the existing production.

Key concepts: Workover, Coiled tubing, Gas lift, Artificial lift, Petroleum engineering, Straddle, Completion (oil and gas wells), Casing