2023SustainabilityOpen access

Development and Height Prediction of Fractured Water-Conducting Zone in Weakly Cemented Overburden: A Case Study of Tashidian Erjingtian Mine

Lifei Zhang, Zizhao Zhang, Kaikai Wang, Xiaodong Tan, Lei Zhang, Tiandong Zhang

Open full text 14 citations

Abstract

To clarify the development and height of the fractured water-conducting zone of underground mines with weakly cemented overburden, the W8203 working face of the Tashidian Erjingtian Mine in Xinjiang, China, was selected to carry out a case study. Firstly, a physical analog model test was conducted to investigate the development law of the water-conducting fracture zone, followed by a numerical simulation via the PFC2D program. Afterward, a theoretical analysis based on the key stratum theory was carried out. The results demonstrated that there were one primary key stratum and three sub-key strata upon the W8203 working face. As verified by the physical analog tests, the water-conducting fracture developed to the bottom of the primary key stratum, and the height of the fractured water-conducting zone was 246.38 m. The numerical analysis suggests that the primary key stratum did not completely break and the fracture did not penetrate the stratum. Theoretical calculation indicated that the primary key stratum maintained stability in the structure without any breakage. The height of the fractured water-conducting zone is comprehensively determined to be 246.38 m, which is relatively close to the measured value (229.32 m). Based on the prediction method of key stratum position combined with the characteristics of weak cemented overburden, a method to predict the height of a water-conducting fracture zone suitable for weak cemented overburden was developed. The accuracy of this method was also verified through an in-depth comparison with field test results. Under the background of the “strategic westward shift” of coal resource exploration and development in China, the research results can provide theoretical and technical support for safe production in the Tashidian Mining Area and references for green and safe production in weakly cemented overburden mining areas in western China.

Open-access reader

About this research paper

What this paper is about

To clarify the development and height of the fractured water-conducting zone of underground mines with weakly cemented overburden, the W8203 working face of the Tashidian Erjingtian Mine in Xinjiang, China, was selected to carry out a case study. Firstly, a physical analog model test was conducted to investigate the development law of the water-conducting fracture zone, followed by a numerical simulation via the PFC2D program. Afterward, a theoretical analysis based on the key stratum theory was carried out. The results demonstrated that there were one primary key stratum and three sub-key strata upon the W8203 working face. As verified by the physical analog tests, the water-conducting fracture developed to the bottom of the primary key stratum, and the height of the fractured water-conducting zone was 246.38 m. The numerical analysis suggests that the primary key stratum did not completely break and the fracture did not penetrate the stratum. Theoretical calculation indicated that the primary key stratum maintained stability in the structure without any breakage. The height of the fractured water-conducting zone is comprehensively determined to be 246.38 m, which is relatively close to the measured value (229.32 m). Based on the prediction method of key stratum position combined with the characteristics of weak cemented overburden, a method to predict the height of a water-conducting fracture zone suitable for weak cemented overburden was developed. The accuracy of this method was also verified through an in-depth comparison with field test results. Under the background of the “strategic westward shift” of coal resource exploration and development in China, the research results can provide theoretical and technical support for safe production in the Tashidian Mining Area and references for green and safe production in weakly cemented overburden mining areas in western China.

Why it matters

OpenAlex reports 14 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

To clarify the development and height of the fractured water-conducting zone of underground mines with weakly cemented overburden, the W8203 working face of the Tashidian Erjingtian Mine in Xinjiang, China, was selected to carry out a case study. Firstly, a physical analog model test was conducted to investigate the development law of the water-conducting fracture zone, followed by a numerical simulation via the PFC2D program. Afterward, a theoretical analysis based on the key stratum theory was carried out. The results demonstrated that there were one primary key stratum and three sub-key strata upon the W8203 working face. As verified by the physical analog tests, the water-conducting fracture developed to the bottom of the primary key stratum, and the height of the fractured water-conducting zone was 246.38 m. The numerical analysis suggests that the primary key stratum did not completely break and the fracture did not penetrate the stratum. Theoretical calculation indicated that the primary key stratum maintained stability in the structure without any breakage. The height of the fractured water-conducting zone is comprehensively determined to be 246.38 m, which is relatively close to the measured value (229.32 m). Based on the prediction method of key stratum position combined with the characteristics of weak cemented overburden, a method to predict the height of a water-conducting fracture zone suitable for weak cemented overburden was developed. The accuracy of this method was also verified through an in-depth comparison with field test results. Under the background of the “strategic westward shift” of coal resource exploration and development in China, the research results can provide theoretical and technical support for safe production in the Tashidian Mining Area and references for green and safe production in weakly cemented overburden mining areas in western China.

Key concepts: Stratum, Overburden, Fracture (geology), Geology, Geotechnical engineering, Breakage, Mining engineering, Materials science

Related papers

Back to paper searchBrowse research topicsOriginal source
Development and Height Prediction of Fractured Water-Conducting Zone in Weakly Cemented Overburden: A Case Study of Tashidian Erjingtian Mine — Research Paper | ScholarLens