2022E3S Web of ConferencesOpen access

The posibility analysis of high-pressure drilling in Block A in Field F

Wenming Zhou

Open full text 0 citations

Abstract

The drilling and shut-in regulations for peripheral oil fields currently follow the standard of the old area of placanticline, i.e., the wellhead pressure of water injection wells within 600m of the drilling well is reduced to below 3MPa before drilling. The regulations did not take into account the depth of the target formation, structural development, reservoir properties and oil and water well connectivity in the peripheral oilfield, which made it difficult to relieve pressure in most of the wells and resulted in longer drilling and shut-in cycles and greater impact on production. In order to minimize the impact of drilling and shut-in on field development and to explore drilling and shut-in limits and standards suitable for peripheral fields, drilling tests were conducted in Block A for infill wells. The feasibility of high pressure drilling in the peripheral low permeability oilfield was analyzed by analyzing the drilling site conditions, the quality of post-completion cementing and the logging data of the completed wells under different pressure conditions.

Open-access reader

About this research paper

What this paper is about

The drilling and shut-in regulations for peripheral oil fields currently follow the standard of the old area of placanticline, i.e., the wellhead pressure of water injection wells within 600m of the drilling well is reduced to below 3MPa before drilling. The regulations did not take into account the depth of the target formation, structural development, reservoir properties and oil and water well connectivity in the peripheral oilfield, which made it difficult to relieve pressure in most of the wells and resulted in longer drilling and shut-in cycles and greater impact on production. In order to minimize the impact of drilling and shut-in on field development and to explore drilling and shut-in limits and standards suitable for peripheral fields, drilling tests were conducted in Block A for infill wells. The feasibility of high pressure drilling in the peripheral low permeability oilfield was analyzed by analyzing the drilling site conditions, the quality of post-completion cementing and the logging data of the completed wells under different pressure conditions.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The drilling and shut-in regulations for peripheral oil fields currently follow the standard of the old area of placanticline, i.e., the wellhead pressure of water injection wells within 600m of the drilling well is reduced to below 3MPa before drilling. The regulations did not take into account the depth of the target formation, structural development, reservoir properties and oil and water well connectivity in the peripheral oilfield, which made it difficult to relieve pressure in most of the wells and resulted in longer drilling and shut-in cycles and greater impact on production. In order to minimize the impact of drilling and shut-in on field development and to explore drilling and shut-in limits and standards suitable for peripheral fields, drilling tests were conducted in Block A for infill wells. The feasibility of high pressure drilling in the peripheral low permeability oilfield was analyzed by analyzing the drilling site conditions, the quality of post-completion cementing and the logging data of the completed wells under different pressure conditions.

Key concepts: Wellhead, Drilling, Petroleum engineering, Infill, Oil field, Drilling fluid, Geology, Shut down

Related papers

Back to paper searchBrowse research topicsOriginal source
The posibility analysis of high-pressure drilling in Block A in Field F — Research Paper | ScholarLens