2022E3S Web of ConferencesOpen access

Research on Ultra-low Permeability Oil Development System Based on Oilfield Fracturing Water Displacement System

Guibin Qin

Open full text 1 citations

Abstract

In order to realize the effective water injection development of oilfield reservoirs, large-scale fracturing technology was introduced. The simulation confirmed that the large-scale fracturing well has the characteristics of high initial production, fast water injection effect, and rapid water cut rise after the effect., the research results show that compared with elastic development, water injection development can solve the problem of rapid formation energy depletion, and at the same time increase the reservoir producing area and displacement time. The final water content of water injection huff and puff is about 25% lower than that of conventional water injection, and advanced water injection can increase the production of conventional elastic development by about 30% in the early stage. It can be seen that these two new development methods are conducive to suppressing water flooding and improving oil recovery.

Open-access reader

About this research paper

What this paper is about

In order to realize the effective water injection development of oilfield reservoirs, large-scale fracturing technology was introduced. The simulation confirmed that the large-scale fracturing well has the characteristics of high initial production, fast water injection effect, and rapid water cut rise after the effect., the research results show that compared with elastic development, water injection development can solve the problem of rapid formation energy depletion, and at the same time increase the reservoir producing area and displacement time. The final water content of water injection huff and puff is about 25% lower than that of conventional water injection, and advanced water injection can increase the production of conventional elastic development by about 30% in the early stage. It can be seen that these two new development methods are conducive to suppressing water flooding and improving oil recovery.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In order to realize the effective water injection development of oilfield reservoirs, large-scale fracturing technology was introduced. The simulation confirmed that the large-scale fracturing well has the characteristics of high initial production, fast water injection effect, and rapid water cut rise after the effect., the research results show that compared with elastic development, water injection development can solve the problem of rapid formation energy depletion, and at the same time increase the reservoir producing area and displacement time. The final water content of water injection huff and puff is about 25% lower than that of conventional water injection, and advanced water injection can increase the production of conventional elastic development by about 30% in the early stage. It can be seen that these two new development methods are conducive to suppressing water flooding and improving oil recovery.

Key concepts: Water flooding, Petroleum engineering, Water injection (oil production), Water cut, Displacement (psychology), Permeability (electromagnetism), Geology, Enhanced oil recovery

Related papers

Back to paper searchBrowse research topicsOriginal source
Research on Ultra-low Permeability Oil Development System Based on Oilfield Fracturing Water Displacement System — Research Paper | ScholarLens