Mining-induced subsidence prediction by Displacement Discontinuity Method: A case from Barapukuria longwall coal mine, Bangladesh
AKM Badrul Alam, Y. Fujii, Shaolin Jahan Eidee, Sophea Boeut, Afikah Binti Rahim
Abstract
Open-access reader
AKM Badrul Alam, Y. Fujii, Shaolin Jahan Eidee, Sophea Boeut, Afikah Binti Rahim
Abstract
Open-access reader
Abstract It is essential to predict the mining-induced subsidence for sustainable mine management. The maximum observed subsidence having a noticeable areal extent due to Northern Upper Panels (NUP) and Southern Lower Panels (SLP) at the Barapukuria longwall coal mine is 5.8 m and 4.2 m, respectively, after the extraction of a 10 m thick coal seam. The mining-induced subsidence was simulated by the Displacement Discontinuity Method (DDM). The numerical model considered the effects of the ground surface, mining panels, faults, and the dyke. The predicted and the observed subsidence due to the mining of NUP and SLP were compared varying Young's modulus, and the 0.10 GPa Young's modulus was found to be the best match in the geo-environmental condition. The effects of the faults and the dyke in the calculation were negligible. Future subsidence was predicted by considering 30 m extraction of the thick coal seam as 15.7–17.5 m in NUP and 8.7–10.5 m in SLP. The vulnerable areas demarcated considering the tilt angle and extensile strain might extend up to the coal mine office area and some villages.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Abstract It is essential to predict the mining-induced subsidence for sustainable mine management. The maximum observed subsidence having a noticeable areal extent due to Northern Upper Panels (NUP) and Southern Lower Panels (SLP) at the Barapukuria longwall coal mine is 5.8 m and 4.2 m, respectively, after the extraction of a 10 m thick coal seam. The mining-induced subsidence was simulated by the Displacement Discontinuity Method (DDM). The numerical model considered the effects of the ground surface, mining panels, faults, and the dyke. The predicted and the observed subsidence due to the mining of NUP and SLP were compared varying Young's modulus, and the 0.10 GPa Young's modulus was found to be the best match in the geo-environmental condition. The effects of the faults and the dyke in the calculation were negligible. Future subsidence was predicted by considering 30 m extraction of the thick coal seam as 15.7–17.5 m in NUP and 8.7–10.5 m in SLP. The vulnerable areas demarcated considering the tilt angle and extensile strain might extend up to the coal mine office area and some villages.
Key concepts: Longwall mining, Discontinuity (linguistics), Subsidence, Coal mining, Ground subsidence, Geology, Coal, Mining engineering