Spon's Practical Guide to Alterations & Extensions
Andrew R. Williams
Abstract
Andrew R. Williams
Abstract
Part 1: Introduction 1. A General Guide to Drawing the Plan 2. The Need for Control 3. Planning and Building Control Part 2: Householder Developments 4. House Extension Policies and The Party Wall Etc Act 1996 5. Is Planning Approval Necessary 6. Applying for Planning Permission 7. Conservation Areas / Listed Buildings / Tree Preservation Orders 8. Other Design Aspects for Consideration Part 3: More on Building Control 9. More on Building Control 10. Is Building Control Required 11. Making the Building Control Submission Part 4: Building Construction 12. General Information 13. The Foundations 14. The External Walls 15. Internal Walls 16. Ground Floors 17. Timber Upper Floors 18. Flat Roofs 19. Pitched Roofs 20. Finishes 21. Ventilation 22. Staircases 23. Plumbing, Drainage, Heating, Installation of Boilers, Electrical Works 24. Other Building Control Aspects Part 5: Mainly for Consultants / Conclusion 25. Preparing to Meet the Client 26. Meeting the Client 27. Conclusion
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Part 1: Introduction 1. A General Guide to Drawing the Plan 2. The Need for Control 3. Planning and Building Control Part 2: Householder Developments 4. House Extension Policies and The Party Wall Etc Act 1996 5. Is Planning Approval Necessary 6. Applying for Planning Permission 7. Conservation Areas / Listed Buildings / Tree Preservation Orders 8. Other Design Aspects for Consideration Part 3: More on Building Control 9. More on Building Control 10. Is Building Control Required 11. Making the Building Control Submission Part 4: Building Construction 12. General Information 13. The Foundations 14. The External Walls 15. Internal Walls 16. Ground Floors 17. Timber Upper Floors 18. Flat Roofs 19. Pitched Roofs 20. Finishes 21. Ventilation 22. Staircases 23. Plumbing, Drainage, Heating, Installation of Boilers, Electrical Works 24. Other Building Control Aspects Part 5: Mainly for Consultants / Conclusion 25. Preparing to Meet the Client 26. Meeting the Client 27. Conclusion
Key concepts: Plan (archaeology), Control (management), Architectural engineering, Permission, Engineering, Civil engineering, Construction engineering, Computer science