Planned Maintenance Schedule Update Method for Predictive Maintenance of Semiconductor Plasma Etcher

Shota Umeda, Kenji Tamaki, Masahiro Sumiya, Yoshito Kamaji

Open publisher page 21 citations

Abstract

In a semiconductor plasma etcher, it is becoming increasingly necessary to improve productivity by reducing unplanned equipment maintenance. Thus, predictive maintenance (PdM) is typically conducted using equipment data to predict the failure timing, after which proactive measures should be taken. In PdM, the planned maintenance schedule is updated on the basis of the predicted failure timing. However, in practice, the predicted failure timing has a probabilistic variability. Therefore, we propose a maintenance schedule update method based on the expected maintenance cost calculated from the probabilistic variability of the failure timing. We applied our method and conventional methods to a dataset of failure cases that model actual component failures of etchers and found that our method was effective in terms of reducing maintenance costs.

About this research paper

What this paper is about

In a semiconductor plasma etcher, it is becoming increasingly necessary to improve productivity by reducing unplanned equipment maintenance. Thus, predictive maintenance (PdM) is typically conducted using equipment data to predict the failure timing, after which proactive measures should be taken. In PdM, the planned maintenance schedule is updated on the basis of the predicted failure timing. However, in practice, the predicted failure timing has a probabilistic variability. Therefore, we propose a maintenance schedule update method based on the expected maintenance cost calculated from the probabilistic variability of the failure timing. We applied our method and conventional methods to a dataset of failure cases that model actual component failures of etchers and found that our method was effective in terms of reducing maintenance costs.

Why it matters

OpenAlex reports 21 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In a semiconductor plasma etcher, it is becoming increasingly necessary to improve productivity by reducing unplanned equipment maintenance. Thus, predictive maintenance (PdM) is typically conducted using equipment data to predict the failure timing, after which proactive measures should be taken. In PdM, the planned maintenance schedule is updated on the basis of the predicted failure timing. However, in practice, the predicted failure timing has a probabilistic variability. Therefore, we propose a maintenance schedule update method based on the expected maintenance cost calculated from the probabilistic variability of the failure timing. We applied our method and conventional methods to a dataset of failure cases that model actual component failures of etchers and found that our method was effective in terms of reducing maintenance costs.

Key concepts: Reliability engineering, Schedule, Predictive maintenance, Probabilistic logic, Maintenance engineering, Component (thermodynamics), Computer science, Planned maintenance