2018•Handbook of environmental engineeringRequires access

Industrial Waste Auditing

C. Visvanathan

Open publisher page 1 citations

Abstract

Waste auditing is as important as any other step in a waste minimization or cleaner production project. This chapter discusses different aspects of waste auditing. The scope of such discussions has been limited to waste audits within a typical manufacturing industry. With increasing popularity and attention to proactive methods, structured methodologies are being developed to systematically explore, analyze, and implement energy conservation and waste minimization or cleaner production programs in industries. Typically, a development cycle of industrial waste minimization programs comprises six phases: inception, audit, analysis, design and development, implementation, and evaluation. The waste audit phase would typically be a data collection and information synthesis phase that explores the current situation. The chapter describes the steps of waste audit methodology: preparatory works for waste audit; preassessment of target processes; assessment; and synthesis and preliminary analysis.

About this research paper

What this paper is about

Waste auditing is as important as any other step in a waste minimization or cleaner production project. This chapter discusses different aspects of waste auditing. The scope of such discussions has been limited to waste audits within a typical manufacturing industry. With increasing popularity and attention to proactive methods, structured methodologies are being developed to systematically explore, analyze, and implement energy conservation and waste minimization or cleaner production programs in industries. Typically, a development cycle of industrial waste minimization programs comprises six phases: inception, audit, analysis, design and development, implementation, and evaluation. The waste audit phase would typically be a data collection and information synthesis phase that explores the current situation. The chapter describes the steps of waste audit methodology: preparatory works for waste audit; preassessment of target processes; assessment; and synthesis and preliminary analysis.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Waste auditing is as important as any other step in a waste minimization or cleaner production project. This chapter discusses different aspects of waste auditing. The scope of such discussions has been limited to waste audits within a typical manufacturing industry. With increasing popularity and attention to proactive methods, structured methodologies are being developed to systematically explore, analyze, and implement energy conservation and waste minimization or cleaner production programs in industries. Typically, a development cycle of industrial waste minimization programs comprises six phases: inception, audit, analysis, design and development, implementation, and evaluation. The waste audit phase would typically be a data collection and information synthesis phase that explores the current situation. The chapter describes the steps of waste audit methodology: preparatory works for waste audit; preassessment of target processes; assessment; and synthesis and preliminary analysis.

Key concepts: Audit, Cleaner production, Scope (computer science), Production (economics), Popularity, Minification, Engineering, Municipal solid waste

Related papers

Back to paper searchBrowse research topicsOriginal source
Industrial Waste Auditing — Research Paper | ScholarLens