Chronological probabilistic production costing and wheeling calculations with transmission network modeling
M.V.F. Pereira, B.G. Gorenstin, M. Morozowski, J.B.d.S. Silva
Abstract
M.V.F. Pereira, B.G. Gorenstin, M. Morozowski, J.B.d.S. Silva
Abstract
An approach for the integrated analysis of generation and transmission systems in terms of production costing and wheeling rate calculation is presented. The methodology is based on the chronological simulation of system operation. Economic dispatch at each state is provided by linearized optimal power flow routines, which can represent network aspects and export/import contracts among utilities. Probabilistic aspects are represented by Monte Carlo sampling of generation capacities, load levels, etc. Marginal costs are calculated at bus level, and serve as a basis for the evaluation of wheeling rates. This makes it possible to model complex utility situations for use in power system planning and operations, determination of interchange contracts, and regulatory applications.>
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
An approach for the integrated analysis of generation and transmission systems in terms of production costing and wheeling rate calculation is presented. The methodology is based on the chronological simulation of system operation. Economic dispatch at each state is provided by linearized optimal power flow routines, which can represent network aspects and export/import contracts among utilities. Probabilistic aspects are represented by Monte Carlo sampling of generation capacities, load levels, etc. Marginal costs are calculated at bus level, and serve as a basis for the evaluation of wheeling rates. This makes it possible to model complex utility situations for use in power system planning and operations, determination of interchange contracts, and regulatory applications.>
Key concepts: Wheeling, Activity-based costing, Probabilistic logic, Computer science, Production (economics), Operations research, Transmission (telecommunications), Marginal cost