(Shippingport Atomic Power Station). Quarterly operating report, second quarter 1976

T. D. Jones

Open full text 0 citations

Abstract

During the second quarter of 1976, the Shippingport Atomic Power Station remained shutdown for PWR/LWBR (Pressurized Water Reactor/Light Water Breeder Reactor) core conversion. The PWR Core has been removed from the reactor vessel and remains in storage in the deep pit of the Fuel Handling Canal. At the beginning of the second quarter, the 1D reactor coolant loop was isolated from the reactor vessel, filled and on head tank pressure. The 1C reactor coolant loop was isolated from the reactor and drained for 1C Main Coolant Pump removal. The 1A and 1B reactor coolant loops were open to the reactor vessel. The pressurizer was open to the reactor vessel.

About this research paper

What this paper is about

During the second quarter of 1976, the Shippingport Atomic Power Station remained shutdown for PWR/LWBR (Pressurized Water Reactor/Light Water Breeder Reactor) core conversion. The PWR Core has been removed from the reactor vessel and remains in storage in the deep pit of the Fuel Handling Canal. At the beginning of the second quarter, the 1D reactor coolant loop was isolated from the reactor vessel, filled and on head tank pressure. The 1C reactor coolant loop was isolated from the reactor and drained for 1C Main Coolant Pump removal. The 1A and 1B reactor coolant loops were open to the reactor vessel. The pressurizer was open to the reactor vessel.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

During the second quarter of 1976, the Shippingport Atomic Power Station remained shutdown for PWR/LWBR (Pressurized Water Reactor/Light Water Breeder Reactor) core conversion. The PWR Core has been removed from the reactor vessel and remains in storage in the deep pit of the Fuel Handling Canal. At the beginning of the second quarter, the 1D reactor coolant loop was isolated from the reactor vessel, filled and on head tank pressure. The 1C reactor coolant loop was isolated from the reactor and drained for 1C Main Coolant Pump removal. The 1A and 1B reactor coolant loops were open to the reactor vessel. The pressurizer was open to the reactor vessel.

Key concepts: Pressurizer, Reactor pressure vessel, Coolant, Nuclear engineering, Shutdown, Pressurized water reactor, Environmental science, Nuclear reactor core

Related papers

Back to paper searchBrowse research topicsOriginal source
(Shippingport Atomic Power Station). Quarterly operating report, second quarter 1976 — Research Paper | ScholarLens