Time Management in Distributed Factory Simulation, a Case Study Using HLA

Ke Wang, Sheng Xu, Leon F. McGinnis

Open publisher page 8 citations

Abstract

Distributed simulation is attractive for modeling large scale manufacturing systems. However, synchronization requirements present distinct challenges in designing and implementing a suitable modeling structure. Our experience in building a distributed simulation model for 300mm wafer fab using the high level architecture (HLA) shows that time management should be considered at both the design and the implementation stages. This paper proposes an optimistic-conservative synchronization scheme by using model specific information at the implementation stage. Computational results are then presented to show that properly implemented distributed factory simulation can achieve significant reduction in model execution time.

About this research paper

What this paper is about

Distributed simulation is attractive for modeling large scale manufacturing systems. However, synchronization requirements present distinct challenges in designing and implementing a suitable modeling structure. Our experience in building a distributed simulation model for 300mm wafer fab using the high level architecture (HLA) shows that time management should be considered at both the design and the implementation stages. This paper proposes an optimistic-conservative synchronization scheme by using model specific information at the implementation stage. Computational results are then presented to show that properly implemented distributed factory simulation can achieve significant reduction in model execution time.

Why it matters

OpenAlex reports 8 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Distributed simulation is attractive for modeling large scale manufacturing systems. However, synchronization requirements present distinct challenges in designing and implementing a suitable modeling structure. Our experience in building a distributed simulation model for 300mm wafer fab using the high level architecture (HLA) shows that time management should be considered at both the design and the implementation stages. This paper proposes an optimistic-conservative synchronization scheme by using model specific information at the implementation stage. Computational results are then presented to show that properly implemented distributed factory simulation can achieve significant reduction in model execution time.

Key concepts: High-level architecture, Synchronization (alternating current), Factory (object-oriented programming), Computer science, Distributed computing, Scheme (mathematics), Architecture, Distributed Interactive Simulation

Related papers

Back to paper searchBrowse research topicsOriginal source
Time Management in Distributed Factory Simulation, a Case Study Using HLA — Research Paper | ScholarLens