2022Cogent EngineeringOpen access

Production lead time improvement through lean manufacturing

Sisay Geremew Gebeyehu, Muluken Abebe, Amdework Gochel

Open full text 42 citations

Abstract

Lean manufacturing (LM) practices and tools have played vital role in several manufacturing industries to enhance the competitive edge in in the global market. The purpose of this paper is to use the lean principles, practice and tools in Hibret Manufacturing & Machine Building Industries (HMMBI) in Ethiopia. The existence of high production lead time is getting the basic problem for HMBI that is why this research gives more attention. The study aims to improve the production lead time by minimizing non-value adding activities associated with several resources in the process. Both qualitative and quantitative data collection methods are used. The process time and floor layout are studied and mapped using Value Stream Mapping, and Spaghetti Diagram to identify wastes. The result shows that production lead time, work in process (WIP), non-value adding time (waiting time) and total distance traveled are reduced by 23.66%, 8.6%, 37.74%, 61.2% respectively. Finally, the process cycle efficiency is improved by 25.59%. The study is found significant for Hibret Manufacturing & Machine Building Industries (HMMBI) and for similar manufacturing industries.

About this research paper

What this paper is about

Lean manufacturing (LM) practices and tools have played vital role in several manufacturing industries to enhance the competitive edge in in the global market. The purpose of this paper is to use the lean principles, practice and tools in Hibret Manufacturing & Machine Building Industries (HMMBI) in Ethiopia. The existence of high production lead time is getting the basic problem for HMBI that is why this research gives more attention. The study aims to improve the production lead time by minimizing non-value adding activities associated with several resources in the process. Both qualitative and quantitative data collection methods are used. The process time and floor layout are studied and mapped using Value Stream Mapping, and Spaghetti Diagram to identify wastes. The result shows that production lead time, work in process (WIP), non-value adding time (waiting time) and total distance traveled are reduced by 23.66%, 8.6%, 37.74%, 61.2% respectively. Finally, the process cycle efficiency is improved by 25.59%. The study is found significant for Hibret Manufacturing & Machine Building Industries (HMMBI) and for similar manufacturing industries.

Why it matters

OpenAlex reports 42 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Lean manufacturing (LM) practices and tools have played vital role in several manufacturing industries to enhance the competitive edge in in the global market. The purpose of this paper is to use the lean principles, practice and tools in Hibret Manufacturing & Machine Building Industries (HMMBI) in Ethiopia. The existence of high production lead time is getting the basic problem for HMBI that is why this research gives more attention. The study aims to improve the production lead time by minimizing non-value adding activities associated with several resources in the process. Both qualitative and quantitative data collection methods are used. The process time and floor layout are studied and mapped using Value Stream Mapping, and Spaghetti Diagram to identify wastes. The result shows that production lead time, work in process (WIP), non-value adding time (waiting time) and total distance traveled are reduced by 23.66%, 8.6%, 37.74%, 61.2% respectively. Finally, the process cycle efficiency is improved by 25.59%. The study is found significant for Hibret Manufacturing & Machine Building Industries (HMMBI) and for similar manufacturing industries.

Key concepts: Value stream mapping, Lead time, Lean manufacturing, Manufacturing engineering, Production (economics), Manufacturing, Process (computing), Work in process

Related papers

Back to paper searchBrowse research topicsOriginal source
Production lead time improvement through lean manufacturing — Research Paper | ScholarLens