2022GeofluidsOpen access

Research of the Backfill Body Compaction Ratio Based on Upward Backfill Safety Mining of the Close-Distance Coal Seam Group

Xingping Lai, Leiming Zhang, Yun Zhang, Pengfei Shan, Peifeng Wan, Kaiwen Mu

Open full text 9 citations

Abstract

During upward backfill mining of the close-distance coal seam group, the reasonable design of the backfill body compaction ratio (BBCR) of lower coal seam goaf plays a key role in controlling overburden strata movement and deformation. In this paper, the feasibility discrimination method of upward caving mining was adopted; it was found that when the coal seam spacing was small, the recovery was not possible due to the instability of the upper coal strata equilibrium structure caused by the mining. Hence, the upward backfill mining method was proposed; combined with the migration control mechanism of backfill mining overburden strata, the dynamic evolution of crack propagation height of overburden strata during upward backfill mining was analyzed. Based on that, a layer spacing-BBCR-mining height (L-R-H) prediction model based on multiple linear regression analysis was established and the BBCR of close-distance coal seam group safe upward mining was determined combined with the engineering background. The results demonstrate that the main controlling factors of crack propagation in overburden strata during upward backfill mining were BBCR and mining height; the crack propagation height in overburden strata caused by mining decreased exponentially with the increase of BBCR and increased with the increase of mining height linearly. The lower coal seam engineering safety BBCR of upward backfill mining in the Dafosi Coal Mine was 87.2%, and the close-distance coal seam group safe upward mining was realized.

Open-access reader

About this research paper

What this paper is about

During upward backfill mining of the close-distance coal seam group, the reasonable design of the backfill body compaction ratio (BBCR) of lower coal seam goaf plays a key role in controlling overburden strata movement and deformation. In this paper, the feasibility discrimination method of upward caving mining was adopted; it was found that when the coal seam spacing was small, the recovery was not possible due to the instability of the upper coal strata equilibrium structure caused by the mining. Hence, the upward backfill mining method was proposed; combined with the migration control mechanism of backfill mining overburden strata, the dynamic evolution of crack propagation height of overburden strata during upward backfill mining was analyzed. Based on that, a layer spacing-BBCR-mining height (L-R-H) prediction model based on multiple linear regression analysis was established and the BBCR of close-distance coal seam group safe upward mining was determined combined with the engineering background. The results demonstrate that the main controlling factors of crack propagation in overburden strata during upward backfill mining were BBCR and mining height; the crack propagation height in overburden strata caused by mining decreased exponentially with the increase of BBCR and increased with the increase of mining height linearly. The lower coal seam engineering safety BBCR of upward backfill mining in the Dafosi Coal Mine was 87.2%, and the close-distance coal seam group safe upward mining was realized.

Why it matters

OpenAlex reports 9 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

During upward backfill mining of the close-distance coal seam group, the reasonable design of the backfill body compaction ratio (BBCR) of lower coal seam goaf plays a key role in controlling overburden strata movement and deformation. In this paper, the feasibility discrimination method of upward caving mining was adopted; it was found that when the coal seam spacing was small, the recovery was not possible due to the instability of the upper coal strata equilibrium structure caused by the mining. Hence, the upward backfill mining method was proposed; combined with the migration control mechanism of backfill mining overburden strata, the dynamic evolution of crack propagation height of overburden strata during upward backfill mining was analyzed. Based on that, a layer spacing-BBCR-mining height (L-R-H) prediction model based on multiple linear regression analysis was established and the BBCR of close-distance coal seam group safe upward mining was determined combined with the engineering background. The results demonstrate that the main controlling factors of crack propagation in overburden strata during upward backfill mining were BBCR and mining height; the crack propagation height in overburden strata caused by mining decreased exponentially with the increase of BBCR and increased with the increase of mining height linearly. The lower coal seam engineering safety BBCR of upward backfill mining in the Dafosi Coal Mine was 87.2%, and the close-distance coal seam group safe upward mining was realized.

Key concepts: Overburden, Coal mining, Mining engineering, Geology, Geotechnical engineering, Compaction, Coal, Problems in coal mining

Related papers

Back to paper searchBrowse research topicsOriginal source
Research of the Backfill Body Compaction Ratio Based on Upward Backfill Safety Mining of the Close-Distance Coal Seam Group — Research Paper | ScholarLens