2021•2021 International Conference on Electronic Information Technology and Smart Agriculture (ICEITSA)Requires access

Distributed Control System of Three-waste Boiler Based on Windows Control Center Configuration Software and Programmable Logic Controller

Fang Yang Liao, Liming Ding, Dajiang He, Linwen Shao, Jie Huang

Open publisher page 1 citations

Abstract

In view of the complexity combustion process of three-waste boiler, designed the Distributed Control System based on Windows Control Center configuration software and Programmable Logic Controller. The system controls and manages the whole three-waste boiler production process, which is composed with three upper monitor, tow Programmable Logic Controller, communication module and field control unit. The upper monitor chooses Windows Control Center configuration software of Siemens Company to design various monitoring menu and set the parameters of backstage, and receive various dates which is transferred by Programmable Logic Controller to finish monitoring and diagnosis and control task of the whole system. It uses the PROFIBUS-DP communication protocol between the upper monitor and Programmable Logic Controller of the lower position. This system is flexible deployed and reliable. After three year of engineering application, this system, realized by this paper, have effectively solved the complex control object in the production process of three-waster boiler, and it correspond to the relevant provisions of our country about energy-saving emission reduction and environmental protection of the enterprise.

About this research paper

What this paper is about

In view of the complexity combustion process of three-waste boiler, designed the Distributed Control System based on Windows Control Center configuration software and Programmable Logic Controller. The system controls and manages the whole three-waste boiler production process, which is composed with three upper monitor, tow Programmable Logic Controller, communication module and field control unit. The upper monitor chooses Windows Control Center configuration software of Siemens Company to design various monitoring menu and set the parameters of backstage, and receive various dates which is transferred by Programmable Logic Controller to finish monitoring and diagnosis and control task of the whole system. It uses the PROFIBUS-DP communication protocol between the upper monitor and Programmable Logic Controller of the lower position. This system is flexible deployed and reliable. After three year of engineering application, this system, realized by this paper, have effectively solved the complex control object in the production process of three-waster boiler, and it correspond to the relevant provisions of our country about energy-saving emission reduction and environmental protection of the enterprise.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In view of the complexity combustion process of three-waste boiler, designed the Distributed Control System based on Windows Control Center configuration software and Programmable Logic Controller. The system controls and manages the whole three-waste boiler production process, which is composed with three upper monitor, tow Programmable Logic Controller, communication module and field control unit. The upper monitor chooses Windows Control Center configuration software of Siemens Company to design various monitoring menu and set the parameters of backstage, and receive various dates which is transferred by Programmable Logic Controller to finish monitoring and diagnosis and control task of the whole system. It uses the PROFIBUS-DP communication protocol between the upper monitor and Programmable Logic Controller of the lower position. This system is flexible deployed and reliable. After three year of engineering application, this system, realized by this paper, have effectively solved the complex control object in the production process of three-waster boiler, and it correspond to the relevant provisions of our country about energy-saving emission reduction and environmental protection of the enterprise.

Key concepts: Programmable logic controller, Distributed control system, Control system, Programmable logic device, Software, Embedded system, Boiler (water heating), Process control

Related papers

Back to paper searchBrowse research topicsOriginal source
Distributed Control System of Three-waste Boiler Based on Windows Control Center Configuration Software and Programmable Logic Controller — Research Paper | ScholarLens