Reliability Evaluation of Roy Billinton Test System
Author information unavailable
Abstract
Open-access reader
Author information unavailable
Abstract
Open-access reader
Reliability play's a major role at power system planning and operation. Reliability means continuous power supply to end users without outages. So in order to study reliability of any system we consider two methods which are Analytical and Monte-Carlo simulation. Analytical methods are mathematical models which gives numerical calculations for simple systems. Monte Carlo Simulation is a proposed method which is used in case of complex systems. RBTS BUS-2 test system is used as case study with DG’s at different locations and without DG’s to evaluate fundamental reliability indices, customer oriented indices SAIFI, SAIDI, CAIDI .Cost/worth indices such as EENS, ECOST and IEAR are calculated and compared by both Analytical and Monte-Carlo simulation. In Monte-Carlo time sequential technics indices are calculated by using random number generators with UP and DOWN states times of system elements.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Reliability play's a major role at power system planning and operation. Reliability means continuous power supply to end users without outages. So in order to study reliability of any system we consider two methods which are Analytical and Monte-Carlo simulation. Analytical methods are mathematical models which gives numerical calculations for simple systems. Monte Carlo Simulation is a proposed method which is used in case of complex systems. RBTS BUS-2 test system is used as case study with DG’s at different locations and without DG’s to evaluate fundamental reliability indices, customer oriented indices SAIFI, SAIDI, CAIDI .Cost/worth indices such as EENS, ECOST and IEAR are calculated and compared by both Analytical and Monte-Carlo simulation. In Monte-Carlo time sequential technics indices are calculated by using random number generators with UP and DOWN states times of system elements.
Key concepts: Monte Carlo method, Reliability (semiconductor), Reliability engineering, Power (physics), Electric power system, Engineering, Computer science, Mathematics