Investigation of Standard Penetration Torque Testing (SPT-T) to Predict Pile Performance
Charles J. Winter, Alan B. Wagner, Van E. Komurka
Abstract
Charles J. Winter, Alan B. Wagner, Van E. Komurka
Abstract
Soil/pile set-up is a time-dependant increase in pile capacity. Incorporation of soil/pile set-up in pile design often has considerable economic benefits, resulting from reduction in pile section, length, and/or size of driving equipment. A number of in-situ tests have been developed to measure set-up that can be performed within a subsurface exploration program. One such test, SPT-Torque (SPT-T) test, is considered to offer the most-favorable combination of applicability of results, ease and simplicity of performing the test, and equipment cost. However, instrumentation has not been formally developed for commercial application, research correlating SPT-T test results to measured soil/pile set-up is limited, and no documented research has involved Wisconsin soils. In addition, previous SPT-T research concentrated on performing tests spanning from several hours to several weeks. Considerably shorter time intervals (on the order of one hour or less) will likely be required if the SPT-T test is to be included in a typical exploration program. The primary objective of this research was to perform short-term SPT-T tests and correlate results to long-term measured soil/pile set-up. The results indicate that there does not appear to be any correlation between set-up values from short-term (1 hour or less) SPT-T tests and unit set-up values obtained from long-term restrikes of test pile installation. Negative set-up (relaxation) exhibited in many short-term SPT-T tests followed by positive set-up also contributes skepticism to using this procedure as a tool to estimate set-up. Therefore, short-term SPT-T testing does not appear to be a practical, economical exploration-phase method to predict soil/pile set-up.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Soil/pile set-up is a time-dependant increase in pile capacity. Incorporation of soil/pile set-up in pile design often has considerable economic benefits, resulting from reduction in pile section, length, and/or size of driving equipment. A number of in-situ tests have been developed to measure set-up that can be performed within a subsurface exploration program. One such test, SPT-Torque (SPT-T) test, is considered to offer the most-favorable combination of applicability of results, ease and simplicity of performing the test, and equipment cost. However, instrumentation has not been formally developed for commercial application, research correlating SPT-T test results to measured soil/pile set-up is limited, and no documented research has involved Wisconsin soils. In addition, previous SPT-T research concentrated on performing tests spanning from several hours to several weeks. Considerably shorter time intervals (on the order of one hour or less) will likely be required if the SPT-T test is to be included in a typical exploration program. The primary objective of this research was to perform short-term SPT-T tests and correlate results to long-term measured soil/pile set-up. The results indicate that there does not appear to be any correlation between set-up values from short-term (1 hour or less) SPT-T tests and unit set-up values obtained from long-term restrikes of test pile installation. Negative set-up (relaxation) exhibited in many short-term SPT-T tests followed by positive set-up also contributes skepticism to using this procedure as a tool to estimate set-up. Therefore, short-term SPT-T testing does not appear to be a practical, economical exploration-phase method to predict soil/pile set-up.
Key concepts: Pile, Geotechnical engineering, Torque, Instrumentation (computer programming), Set (abstract data type), Term (time), Penetration test, Engineering