2001Open Access System for Information Sharing (Pohang University of Science and Technology)Requires access

LONG-LIFE REHABILITATION DESIGN AND CONSTRUCTION: I-710 FREEWAY, LONG BEACH, CALIFORNIA

J St Martin, J Harvey, Fei Long, Eul‐Bum Lee, C L Monismith, K Herritt

Open publisher page 8 citations

Abstract

This paper briefly describes the methodologies used for the mix and structural pavement section designs for the rehabilitation of the Interstate 710 (I-710) freeway adjacent to the Port of Long Beach, California, which include asphalt concrete (AC) replacement structures in the vicinity of three overcrossings and AC overlays on the broken and seated existing portland cement concrete pavement sections. Both structural pavement sections have been designed to accommodate estimated traffic of 200 million equivalent single-axle loads. Critical to the successful performance of these pavement structures in this heavily trafficked section of the I-710 are the construction quality control and quality assurance and mix design requirements. Important aspects of the construction requirements are also discussed, which include strict controls on the aggregate and binder contents as well as the compaction of the mixes utilized in the pavement sections. Staging of construction including considerations relating to construction management to meet the 55-h weekend closures planned for the freeway are also described. Finally, the paper emphasizes the importance of the partnered effort between the California Department of Transportation, the Asphalt Industry in California, and the University of California at Berkeley, in developing the requisite design and construction requirements for this project.

About this research paper

What this paper is about

This paper briefly describes the methodologies used for the mix and structural pavement section designs for the rehabilitation of the Interstate 710 (I-710) freeway adjacent to the Port of Long Beach, California, which include asphalt concrete (AC) replacement structures in the vicinity of three overcrossings and AC overlays on the broken and seated existing portland cement concrete pavement sections. Both structural pavement sections have been designed to accommodate estimated traffic of 200 million equivalent single-axle loads. Critical to the successful performance of these pavement structures in this heavily trafficked section of the I-710 are the construction quality control and quality assurance and mix design requirements. Important aspects of the construction requirements are also discussed, which include strict controls on the aggregate and binder contents as well as the compaction of the mixes utilized in the pavement sections. Staging of construction including considerations relating to construction management to meet the 55-h weekend closures planned for the freeway are also described. Finally, the paper emphasizes the importance of the partnered effort between the California Department of Transportation, the Asphalt Industry in California, and the University of California at Berkeley, in developing the requisite design and construction requirements for this project.

Why it matters

OpenAlex reports 8 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper briefly describes the methodologies used for the mix and structural pavement section designs for the rehabilitation of the Interstate 710 (I-710) freeway adjacent to the Port of Long Beach, California, which include asphalt concrete (AC) replacement structures in the vicinity of three overcrossings and AC overlays on the broken and seated existing portland cement concrete pavement sections. Both structural pavement sections have been designed to accommodate estimated traffic of 200 million equivalent single-axle loads. Critical to the successful performance of these pavement structures in this heavily trafficked section of the I-710 are the construction quality control and quality assurance and mix design requirements. Important aspects of the construction requirements are also discussed, which include strict controls on the aggregate and binder contents as well as the compaction of the mixes utilized in the pavement sections. Staging of construction including considerations relating to construction management to meet the 55-h weekend closures planned for the freeway are also described. Finally, the paper emphasizes the importance of the partnered effort between the California Department of Transportation, the Asphalt Industry in California, and the University of California at Berkeley, in developing the requisite design and construction requirements for this project.

Key concepts: Engineering, Overlay, Civil engineering, Transport engineering, Subgrade, Driver rehabilitation, Pavement engineering, Quality assurance

Related papers

Back to paper searchBrowse research topicsOriginal source
LONG-LIFE REHABILITATION DESIGN AND CONSTRUCTION: I-710 FREEWAY, LONG BEACH, CALIFORNIA — Research Paper | ScholarLens