1981Proc. Annu. Meet. - Am. Sect. Int. Sol. Energy Soc.; (United States)Requires access

Fire station: DOE demonstration retrofit in cloud belt region

M. Emanuel Levy

Open publisher page 0 citations

Abstract

The Central Fire Station No. 1 in Fort Wayne, Indiana, was one of the most energy inefficient of city facilities, although the building is of contemporary construction. An energy conservation and solar retrofit was performed on the building. The project includes insulation, double glazing, weatherization, thermal shade and shutters, and energy conservation measures on the existing building. New construction entailed retrofit matrix air collectors applied to masonry walls, an attached greenhouse containing a passive solar hot water system, and a rooftop active solar hot water system. Discussed are the political setting, design program, design elements, performance projection, current status, and construction details.

About this research paper

What this paper is about

The Central Fire Station No. 1 in Fort Wayne, Indiana, was one of the most energy inefficient of city facilities, although the building is of contemporary construction. An energy conservation and solar retrofit was performed on the building. The project includes insulation, double glazing, weatherization, thermal shade and shutters, and energy conservation measures on the existing building. New construction entailed retrofit matrix air collectors applied to masonry walls, an attached greenhouse containing a passive solar hot water system, and a rooftop active solar hot water system. Discussed are the political setting, design program, design elements, performance projection, current status, and construction details.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The Central Fire Station No. 1 in Fort Wayne, Indiana, was one of the most energy inefficient of city facilities, although the building is of contemporary construction. An energy conservation and solar retrofit was performed on the building. The project includes insulation, double glazing, weatherization, thermal shade and shutters, and energy conservation measures on the existing building. New construction entailed retrofit matrix air collectors applied to masonry walls, an attached greenhouse containing a passive solar hot water system, and a rooftop active solar hot water system. Discussed are the political setting, design program, design elements, performance projection, current status, and construction details.

Key concepts: Glazing, Architectural engineering, Low-energy house, Energy conservation, Engineering, Civil engineering, Passive solar building design, Thermal insulation

Related papers

Back to paper searchBrowse research topicsOriginal source
Fire station: DOE demonstration retrofit in cloud belt region — Research Paper | ScholarLens