The first part of the new Copenhagen mini-metro route in Denmark will be opened in October 2002. The first phase starts at Noerreport and finishes at Lergravsparken or Oerestad. Driverless metro trains will run frequently and without a timetable. Phase 2a between Noerreport and Frederiksberg and Phase 2b between Frederiksberg and Vanloese will open in 2003. Phase 3 to Copenhagen Airport is scheduled to open in 2006. Construction is by the Comet consortium, with a budget of #892m. The metro runs in circular section tunnels drilled with a tunnel-boring machine. Where trains have to switch tracks, the tunnel cross-section is oval and the tunnel is created with the New Austrian Tunnelling Method. Where the metro surfaces the cut-and-cover method is used. All stations are constructed 'top down' except for Christianshavn Torv, which is constructed 'bottom up'. A metro transfer tunnel is being constructed at Noerreport to allow access to the above-ground Danish State Railways.

About this research paper

What this paper is about

The first part of the new Copenhagen mini-metro route in Denmark will be opened in October 2002. The first phase starts at Noerreport and finishes at Lergravsparken or Oerestad. Driverless metro trains will run frequently and without a timetable. Phase 2a between Noerreport and Frederiksberg and Phase 2b between Frederiksberg and Vanloese will open in 2003. Phase 3 to Copenhagen Airport is scheduled to open in 2006. Construction is by the Comet consortium, with a budget of #892m. The metro runs in circular section tunnels drilled with a tunnel-boring machine. Where trains have to switch tracks, the tunnel cross-section is oval and the tunnel is created with the New Austrian Tunnelling Method. Where the metro surfaces the cut-and-cover method is used. All stations are constructed 'top down' except for Christianshavn Torv, which is constructed 'bottom up'. A metro transfer tunnel is being constructed at Noerreport to allow access to the above-ground Danish State Railways.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The first part of the new Copenhagen mini-metro route in Denmark will be opened in October 2002. The first phase starts at Noerreport and finishes at Lergravsparken or Oerestad. Driverless metro trains will run frequently and without a timetable. Phase 2a between Noerreport and Frederiksberg and Phase 2b between Frederiksberg and Vanloese will open in 2003. Phase 3 to Copenhagen Airport is scheduled to open in 2006. Construction is by the Comet consortium, with a budget of #892m. The metro runs in circular section tunnels drilled with a tunnel-boring machine. Where trains have to switch tracks, the tunnel cross-section is oval and the tunnel is created with the New Austrian Tunnelling Method. Where the metro surfaces the cut-and-cover method is used. All stations are constructed 'top down' except for Christianshavn Torv, which is constructed 'bottom up'. A metro transfer tunnel is being constructed at Noerreport to allow access to the above-ground Danish State Railways.

Key concepts: Train, Section (typography), Engineering, Railway tunnel, Phase (matter), Cruise, Civil engineering, Geography

Related papers

Back to paper searchBrowse research topicsOriginal source
COUPLERS ON THE COPENHAGEN MINI-METRO — Research Paper | ScholarLens