Performance evaluation of waterproofing membrane protective systems for concrete bridge decks. Final report 3 January-3 November 1983
K Babaei, R L Terrel
Abstract
K Babaei, R L Terrel
Abstract
This study develops a methodology for field appraisal and evaluates the effectiveness of three selected waterproofing membrane installations presently in service in the State of Washington. Based on the information obtained, none of the test installations had completely sealed the passage of salt into the concrete decks. 'Active' and 'uncertain' corrosion potentials existed at the rehabilitated portions; however, a decrease in corrosion activity since the time of rehabilitation was noted. Concrete deterioration after rehabilitation has occurred mainly within the boundaries of the repair work and original concrete, and it is more evident in areas with a shallower rebar depth. It is recommended that future research include a greater number of bridge decks. In addition, service life performance data should be obtained through long-range monitoring of the installations.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This study develops a methodology for field appraisal and evaluates the effectiveness of three selected waterproofing membrane installations presently in service in the State of Washington. Based on the information obtained, none of the test installations had completely sealed the passage of salt into the concrete decks. 'Active' and 'uncertain' corrosion potentials existed at the rehabilitated portions; however, a decrease in corrosion activity since the time of rehabilitation was noted. Concrete deterioration after rehabilitation has occurred mainly within the boundaries of the repair work and original concrete, and it is more evident in areas with a shallower rebar depth. It is recommended that future research include a greater number of bridge decks. In addition, service life performance data should be obtained through long-range monitoring of the installations.
Key concepts: Waterproofing, Bridge (graph theory), Service life, Corrosion, Engineering, Forensic engineering, Rebar, Work (physics)