1974OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information)Requires access

Boiler modification cost survey for sulfur oxides control by fuel substitution. Environmental protection technology series (final)

Robert Schreiber, Adam J. Davis, J. Delacy, Yu-Hsuan Chang, H. Lockwood

Open publisher page 0 citations

Abstract

Results are presented of a study to identify capital costs associated with converting industrial and utility boilers from conventional high-sulfur fossil fuels to low-sulfur products from selected coal conversion processes. The boilers of concern include all industrial and utility size equipment in the 10 to the 7th power to 10 to the 10th power Btu/hr capacity range. The substitute fuels include solvent refined coal (SRC) in the solid and hot liquid (melted) phases as well as lower-Btu gas. The cost assessment methods used in the study showed that conversion to liquid SRC is the most expensive alternative. Converting coal-fired boilers to solid SRC is the least expensive alternative for these types of boilers. Between the costs of converting to SRC in either phase lie those costs for converting to the gaseous fuels. A significant result of the study is that the costs of all conversion strategies increase exponentially with boiler capacity: cost appears to be a weak function of boiler design. (GRA)

About this research paper

What this paper is about

Results are presented of a study to identify capital costs associated with converting industrial and utility boilers from conventional high-sulfur fossil fuels to low-sulfur products from selected coal conversion processes. The boilers of concern include all industrial and utility size equipment in the 10 to the 7th power to 10 to the 10th power Btu/hr capacity range. The substitute fuels include solvent refined coal (SRC) in the solid and hot liquid (melted) phases as well as lower-Btu gas. The cost assessment methods used in the study showed that conversion to liquid SRC is the most expensive alternative. Converting coal-fired boilers to solid SRC is the least expensive alternative for these types of boilers. Between the costs of converting to SRC in either phase lie those costs for converting to the gaseous fuels. A significant result of the study is that the costs of all conversion strategies increase exponentially with boiler capacity: cost appears to be a weak function of boiler design. (GRA)

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Results are presented of a study to identify capital costs associated with converting industrial and utility boilers from conventional high-sulfur fossil fuels to low-sulfur products from selected coal conversion processes. The boilers of concern include all industrial and utility size equipment in the 10 to the 7th power to 10 to the 10th power Btu/hr capacity range. The substitute fuels include solvent refined coal (SRC) in the solid and hot liquid (melted) phases as well as lower-Btu gas. The cost assessment methods used in the study showed that conversion to liquid SRC is the most expensive alternative. Converting coal-fired boilers to solid SRC is the least expensive alternative for these types of boilers. Between the costs of converting to SRC in either phase lie those costs for converting to the gaseous fuels. A significant result of the study is that the costs of all conversion strategies increase exponentially with boiler capacity: cost appears to be a weak function of boiler design. (GRA)

Key concepts: Boiler (water heating), Coal, Capital cost, Waste management, Fossil fuel, Solid fuel, Engineering, Sulfur

Related papers

Back to paper searchBrowse research topicsOriginal source
Boiler modification cost survey for sulfur oxides control by fuel substitution. Environmental protection technology series (final) — Research Paper | ScholarLens