INTEGRATED ENGINEERING AND SERVICE TESTS OF SYSTEM, VESSEL MOORING, MULTI-LEG.
Neese, Marlin P., Cauble, James S., Evans, Elisha J., Jr., Hines, Ralph T.
Abstract
Neese, Marlin P., Cauble, James S., Evans, Elisha J., Jr., Hines, Ralph T.
Abstract
The multi-leg tanker mooring system consists of five to eight mooring points. The test item is made up of a buoy, anchor, and the connecting riser cable. A lightweight, high-holding power anchor of the explosive embedment type is the unique feature of this system. The anchor, a mooring buoy, and associated launching gear are assembled into a packaged unit (launch-can), which is towed into position by Mooring Installation Boat. After the mooring buoy is pulled from the unit, the container is used as a launcher for the explosive anchor. The explosive embedment anchor (EEA) is released from the launch-can and fired by a contact fuze upon contact with the ocean floor. It is useable immediately after being keyed into position and proof-tested for 100,000-lb holding power. The EEA is designed for a 300,000-lb holding capacity under the most favorable sea-floor conditions. Weight is approximately 9 tons per leg. The System, Vessel Mooring, Multi-Leg, failed to satisfy the essential requirements of the QMR in the following tests: Preoperational Inspection, Installation, Mooring and Unmooring, and Reliability (ST).
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The multi-leg tanker mooring system consists of five to eight mooring points. The test item is made up of a buoy, anchor, and the connecting riser cable. A lightweight, high-holding power anchor of the explosive embedment type is the unique feature of this system. The anchor, a mooring buoy, and associated launching gear are assembled into a packaged unit (launch-can), which is towed into position by Mooring Installation Boat. After the mooring buoy is pulled from the unit, the container is used as a launcher for the explosive anchor. The explosive embedment anchor (EEA) is released from the launch-can and fired by a contact fuze upon contact with the ocean floor. It is useable immediately after being keyed into position and proof-tested for 100,000-lb holding power. The EEA is designed for a 300,000-lb holding capacity under the most favorable sea-floor conditions. Weight is approximately 9 tons per leg. The System, Vessel Mooring, Multi-Leg, failed to satisfy the essential requirements of the QMR in the following tests: Preoperational Inspection, Installation, Mooring and Unmooring, and Reliability (ST).
Key concepts: Mooring, Marine engineering, Engineering, Buoy, Inflatable, Structural engineering