NEW AUSTRIAN TUNNELLING METHOD (NATM), CONTRACTUAL ASPECTS

Johann Golser, K Mussger

Open publisher page 3 citations

Abstract

Parallel to the technical development of the New Austrian Tunnelling Method the corresponding contractual considerations undergo a continuous process of adaption and improvement. It is of great importance to establish basic contractual principles for each specific project and to prepare a comprehensive specification which will cover any situation developing on site. Any far reaching generalization of contract conditions should be avoided. Each contract must be seen on its own merits and in the light of the contractural aspects explained in the paper.

About this research paper

What this paper is about

Parallel to the technical development of the New Austrian Tunnelling Method the corresponding contractual considerations undergo a continuous process of adaption and improvement. It is of great importance to establish basic contractual principles for each specific project and to prepare a comprehensive specification which will cover any situation developing on site. Any far reaching generalization of contract conditions should be avoided. Each contract must be seen on its own merits and in the light of the contractural aspects explained in the paper.

Why it matters

OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Parallel to the technical development of the New Austrian Tunnelling Method the corresponding contractual considerations undergo a continuous process of adaption and improvement. It is of great importance to establish basic contractual principles for each specific project and to prepare a comprehensive specification which will cover any situation developing on site. Any far reaching generalization of contract conditions should be avoided. Each contract must be seen on its own merits and in the light of the contractural aspects explained in the paper.

Key concepts: New Austrian Tunnelling method, Process (computing), Generalization, Construction engineering, Cover (algebra), Civil engineering, Engineering, Risk analysis (engineering)

Related papers

Back to paper searchBrowse research topicsOriginal source
NEW AUSTRIAN TUNNELLING METHOD (NATM), CONTRACTUAL ASPECTS — Research Paper | ScholarLens