NEW AUSTRIAN TUNNELLING METHOD (NATM), CONTRACTUAL ASPECTS
Johann Golser, K Mussger
Abstract
Johann Golser, K Mussger
Abstract
Parallel to the technical development of the New Austrian Tunnelling Method the corresponding contractual considerations undergo a continuous process of adaption and improvement. It is of great importance to establish basic contractual principles for each specific project and to prepare a comprehensive specification which will cover any situation developing on site. Any far reaching generalization of contract conditions should be avoided. Each contract must be seen on its own merits and in the light of the contractural aspects explained in the paper.
OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Parallel to the technical development of the New Austrian Tunnelling Method the corresponding contractual considerations undergo a continuous process of adaption and improvement. It is of great importance to establish basic contractual principles for each specific project and to prepare a comprehensive specification which will cover any situation developing on site. Any far reaching generalization of contract conditions should be avoided. Each contract must be seen on its own merits and in the light of the contractural aspects explained in the paper.
Key concepts: New Austrian Tunnelling method, Process (computing), Generalization, Construction engineering, Cover (algebra), Civil engineering, Engineering, Risk analysis (engineering)