2015Unpublished venueRequires access

Hazard research on reservoir flood limit water level adjustment by flood prediction model

Zhijun Zhang

Open publisher page 0 citations

Abstract

Flood control forecast dispatch is a scheduling mode of flood resource utilization based on the preflood forecast information, Improved flood Criterion of original plan and Advance pre-discharge realization, thereby raising the flood limited level of the reservoir [1-4]. Since Flood forecast information exists forecast error, whether will the reservoir and its upstream and downstream flood risk increase after using Flood control forecast? Whether can the increased risk be acceptable? This is the key to the implementation of flood control forecast, but also the focus of attention of scheduling decision makers.

About this research paper

What this paper is about

Flood control forecast dispatch is a scheduling mode of flood resource utilization based on the preflood forecast information, Improved flood Criterion of original plan and Advance pre-discharge realization, thereby raising the flood limited level of the reservoir [1-4]. Since Flood forecast information exists forecast error, whether will the reservoir and its upstream and downstream flood risk increase after using Flood control forecast? Whether can the increased risk be acceptable? This is the key to the implementation of flood control forecast, but also the focus of attention of scheduling decision makers.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Flood control forecast dispatch is a scheduling mode of flood resource utilization based on the preflood forecast information, Improved flood Criterion of original plan and Advance pre-discharge realization, thereby raising the flood limited level of the reservoir [1-4]. Since Flood forecast information exists forecast error, whether will the reservoir and its upstream and downstream flood risk increase after using Flood control forecast? Whether can the increased risk be acceptable? This is the key to the implementation of flood control forecast, but also the focus of attention of scheduling decision makers.

Key concepts: Flood myth, Environmental science, Hazard, Limit (mathematics), 100-year flood, Hydrology (agriculture), Geology, Geography