2021Procedia ManufacturingOpen access

Manufacturing Plant Layout Improvement: Case study of a High-Temperature Heat Treatment Tooling Manufacturer in Northeast Indiana

Behin Elahi

Open full text 12 citations

Abstract

As the number of competitors in the global marketplace is increasing very fast, it is essential for companies to reduce their lead-time to be sustainable game players. The objectives of this research are to a) improve the layout of a job shop production plant and b) enhance the flow of material from one station to another station to reduce lead times and enhance energy management. This paper focuses on a high-temperature heat treatment tooling manufacturer located in Northeast Indiana, USA. It found that the facility layout at the company was not optimal and over the past several decades, machines and equipment have been purchased and placed wherever there was room to place them. There was a significant amount of materials that are being back-tracked and moved by personnel, ultimately taking longer to produce the parts. The overall aspect of this research was to come up with an efficient robust system to improve the material flow throughout the manufacturing process and to ultimately reduce lead times to improve customers’ satisfaction and enhance energy management. For this purpose, the collective system design methodology integrated with systematic layout planning technique is applied to recognize systems’ needs and find possible scenarios based on activity relationships analysis, adjacency of operations, and total closeness ratings. Through the relationship activity diagram, the importance of adjacency among operations was assessed. Analysis on minimizing the travel distance and material handling along with conducted energy assessments verified that there are significant reductions in feet travelled per day and substantial increases in energy savings. Implementing such a layout improvement project resulted in a 16.66 % up to 33% reduction in lead-time of products (heat treating baskets), significant decreases in weekly overtime hours, and considerable enhancements in energy usage.

Open-access reader

About this research paper

What this paper is about

As the number of competitors in the global marketplace is increasing very fast, it is essential for companies to reduce their lead-time to be sustainable game players. The objectives of this research are to a) improve the layout of a job shop production plant and b) enhance the flow of material from one station to another station to reduce lead times and enhance energy management. This paper focuses on a high-temperature heat treatment tooling manufacturer located in Northeast Indiana, USA. It found that the facility layout at the company was not optimal and over the past several decades, machines and equipment have been purchased and placed wherever there was room to place them. There was a significant amount of materials that are being back-tracked and moved by personnel, ultimately taking longer to produce the parts. The overall aspect of this research was to come up with an efficient robust system to improve the material flow throughout the manufacturing process and to ultimately reduce lead times to improve customers’ satisfaction and enhance energy management. For this purpose, the collective system design methodology integrated with systematic layout planning technique is applied to recognize systems’ needs and find possible scenarios based on activity relationships analysis, adjacency of operations, and total closeness ratings. Through the relationship activity diagram, the importance of adjacency among operations was assessed. Analysis on minimizing the travel distance and material handling along with conducted energy assessments verified that there are significant reductions in feet travelled per day and substantial increases in energy savings. Implementing such a layout improvement project resulted in a 16.66 % up to 33% reduction in lead-time of products (heat treating baskets), significant decreases in weekly overtime hours, and considerable enhancements in energy usage.

Why it matters

OpenAlex reports 12 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

As the number of competitors in the global marketplace is increasing very fast, it is essential for companies to reduce their lead-time to be sustainable game players. The objectives of this research are to a) improve the layout of a job shop production plant and b) enhance the flow of material from one station to another station to reduce lead times and enhance energy management. This paper focuses on a high-temperature heat treatment tooling manufacturer located in Northeast Indiana, USA. It found that the facility layout at the company was not optimal and over the past several decades, machines and equipment have been purchased and placed wherever there was room to place them. There was a significant amount of materials that are being back-tracked and moved by personnel, ultimately taking longer to produce the parts. The overall aspect of this research was to come up with an efficient robust system to improve the material flow throughout the manufacturing process and to ultimately reduce lead times to improve customers’ satisfaction and enhance energy management. For this purpose, the collective system design methodology integrated with systematic layout planning technique is applied to recognize systems’ needs and find possible scenarios based on activity relationships analysis, adjacency of operations, and total closeness ratings. Through the relationship activity diagram, the importance of adjacency among operations was assessed. Analysis on minimizing the travel distance and material handling along with conducted energy assessments verified that there are significant reductions in feet travelled per day and substantial increases in energy savings. Implementing such a layout improvement project resulted in a 16.66 % up to 33% reduction in lead-time of products (heat treating baskets), significant decreases in weekly overtime hours, and considerable enhancements in energy usage.

Key concepts: Closeness, Competitor analysis, Lead time, Adjacency list, Process (computing), Production (economics), Operations management, Manufacturing engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Manufacturing Plant Layout Improvement: Case study of a High-Temperature Heat Treatment Tooling Manufacturer in Northeast Indiana — Research Paper | ScholarLens