An apartment should be build using deep foundation which is pile foundation. Commonly, the pile foundation used a non-displacement of bored pile cast in place with the supported of temporary casing. The working of bored pile foundation has three stage which is first stage cast in place of bored pile, then, install the pile cap on top of the bored pile and lastly, followed by stump of the column. The site working on 172 of bored pile, 109 of pile cap and stump respectively. As the soil at the site is an ex-mines site, the pile need to be test their own workability. In fact, to avoid any collapse of the foundation, before concreting process, the concrete need to test their flexibility and strengthens. In order to test the flexibility, the concrete will be tested using slump test while to test the strengths, the concrete will be used cube test. Besides that, there are 5 types of tests on pile which is instrument load test, maintained load test, pile integrity test, sonic logging test and pile dynamic analyzer. The tests need to be carried out to detect if the pile has defects, damages or cracks in it. It also to analyze the strengths of the pile. If the casting of bored pile is failed then, the casting of pile cap is delayed.

About this research paper

What this paper is about

An apartment should be build using deep foundation which is pile foundation. Commonly, the pile foundation used a non-displacement of bored pile cast in place with the supported of temporary casing. The working of bored pile foundation has three stage which is first stage cast in place of bored pile, then, install the pile cap on top of the bored pile and lastly, followed by stump of the column. The site working on 172 of bored pile, 109 of pile cap and stump respectively. As the soil at the site is an ex-mines site, the pile need to be test their own workability. In fact, to avoid any collapse of the foundation, before concreting process, the concrete need to test their flexibility and strengthens. In order to test the flexibility, the concrete will be tested using slump test while to test the strengths, the concrete will be used cube test. Besides that, there are 5 types of tests on pile which is instrument load test, maintained load test, pile integrity test, sonic logging test and pile dynamic analyzer. The tests need to be carried out to detect if the pile has defects, damages or cracks in it. It also to analyze the strengths of the pile. If the casting of bored pile is failed then, the casting of pile cap is delayed.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

An apartment should be build using deep foundation which is pile foundation. Commonly, the pile foundation used a non-displacement of bored pile cast in place with the supported of temporary casing. The working of bored pile foundation has three stage which is first stage cast in place of bored pile, then, install the pile cap on top of the bored pile and lastly, followed by stump of the column. The site working on 172 of bored pile, 109 of pile cap and stump respectively. As the soil at the site is an ex-mines site, the pile need to be test their own workability. In fact, to avoid any collapse of the foundation, before concreting process, the concrete need to test their flexibility and strengthens. In order to test the flexibility, the concrete will be tested using slump test while to test the strengths, the concrete will be used cube test. Besides that, there are 5 types of tests on pile which is instrument load test, maintained load test, pile integrity test, sonic logging test and pile dynamic analyzer. The tests need to be carried out to detect if the pile has defects, damages or cracks in it. It also to analyze the strengths of the pile. If the casting of bored pile is failed then, the casting of pile cap is delayed.

Key concepts: Pile, Foundation (evidence), Geotechnical engineering, Engineering, Load testing, Dynamic load testing, Casing, Structural engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
The installation of bored pile foundation / Nur Ashikin Abdul Rahman — Research Paper | ScholarLens