Shuttle demonstration of large space structure fabrication and assembly
R. Fleisig
Abstract
R. Fleisig
Abstract
This paper describes a program aimed at the early on-orbit demonstration of a large-space-structure fabrication and assembly capability. Requirements for the demonstration concept have been formulated. The concept selected to meet these requirements is a Large Space Structure Platform consisting of a triangular prism of 31.5 m length. Sensors can be mounted on this platform to perform earth-observation measurements from space. Structural elements of the platform are fabricated using an automated beam builder in the Shuttle Orbiter payload bay. Special fixtures are designed to assemble the structure with the aid of the remote manipulator system and two astroworkers in an EVA mode. Results of the platform preliminary design are presented in terms of a design layout with related structural, thermal, mass-properties, and control-dynamics data. The assembly scenario is described. Estimates of the total construction time and Orbiter support requirements are also presented.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This paper describes a program aimed at the early on-orbit demonstration of a large-space-structure fabrication and assembly capability. Requirements for the demonstration concept have been formulated. The concept selected to meet these requirements is a Large Space Structure Platform consisting of a triangular prism of 31.5 m length. Sensors can be mounted on this platform to perform earth-observation measurements from space. Structural elements of the platform are fabricated using an automated beam builder in the Shuttle Orbiter payload bay. Special fixtures are designed to assemble the structure with the aid of the remote manipulator system and two astroworkers in an EVA mode. Results of the platform preliminary design are presented in terms of a design layout with related structural, thermal, mass-properties, and control-dynamics data. The assembly scenario is described. Estimates of the total construction time and Orbiter support requirements are also presented.
Key concepts: Orbiter, Payload (computing), Space Shuttle, Fabrication, Aerospace engineering, Computer science, Engineering, Mechanical engineering