2021E3S Web of ConferencesOpen access

Inversion analysis and safety evaluation of deformation of cutoff wall in Daning Reservoir

Honghu Yuan, Kun Liao, Wang Yu

Open full text 0 citations

Abstract

There is a large amount of backfilled earth on both sides of the wall and the top of the lower wall of the Daning Reservoir’s cutoff wall, which is greatly disturbed by the project, and the safety of the cutoff wall needs to be evaluated. Based on the deformation law and stress condition of rigid cutoff wall during construction, according to the connection characteristics of rigid cutoff wall and plastic cutoff wall structure, the stress analysis of rigid cutoff wall is carried out by using field measurement data, so as to deduce the deformation law of plastic cutoff wall underneath, and evaluate the safety of plastic cutoff wall. The results show that the plastic cutoff wall is mainly affected by compressive stress, and the maximum compressive stress is far less than the allowable compressive stress, which indicates that the plastic cutoff wall is safe and stable during the whole construction period, although it is affected by construction and rigid cutoff wall.

Open-access reader

About this research paper

What this paper is about

There is a large amount of backfilled earth on both sides of the wall and the top of the lower wall of the Daning Reservoir’s cutoff wall, which is greatly disturbed by the project, and the safety of the cutoff wall needs to be evaluated. Based on the deformation law and stress condition of rigid cutoff wall during construction, according to the connection characteristics of rigid cutoff wall and plastic cutoff wall structure, the stress analysis of rigid cutoff wall is carried out by using field measurement data, so as to deduce the deformation law of plastic cutoff wall underneath, and evaluate the safety of plastic cutoff wall. The results show that the plastic cutoff wall is mainly affected by compressive stress, and the maximum compressive stress is far less than the allowable compressive stress, which indicates that the plastic cutoff wall is safe and stable during the whole construction period, although it is affected by construction and rigid cutoff wall.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

There is a large amount of backfilled earth on both sides of the wall and the top of the lower wall of the Daning Reservoir’s cutoff wall, which is greatly disturbed by the project, and the safety of the cutoff wall needs to be evaluated. Based on the deformation law and stress condition of rigid cutoff wall during construction, according to the connection characteristics of rigid cutoff wall and plastic cutoff wall structure, the stress analysis of rigid cutoff wall is carried out by using field measurement data, so as to deduce the deformation law of plastic cutoff wall underneath, and evaluate the safety of plastic cutoff wall. The results show that the plastic cutoff wall is mainly affected by compressive stress, and the maximum compressive stress is far less than the allowable compressive stress, which indicates that the plastic cutoff wall is safe and stable during the whole construction period, although it is affected by construction and rigid cutoff wall.

Key concepts: Cutoff, Cutoff frequency, Stress (linguistics), Mechanics, Deformation (meteorology), Materials science, Geotechnical engineering, Physics