2017•JACOWOpen access

High Power Conditioning and First Beam Acceleration of the CSNS DTL-1

Yun Wang, Qiang Chen, Mengxu Fan, Keyun Gong, Ahong Li, Bo Li, Hua Liu, Jun Peng, Peihua Qu, Xiao Guang Wu

Open full text 0 citations

Abstract

The CSNS DTLs are divided into 4 cavities. The DTL-1 was transferred and installed in the CSNS Linac tunnel in August of 2015. The RF high power conditioning of DTL-1 started in December 2015 and ended in February 2016. At the end, we finished DTL-1 high power conditioning mission with peak power 1.5MW (1.1 times design value), 1.625% duty factor (650us, 25Hz). And the first beam has been successfully accelerated to the design value 21.6MeV with nearly 100% transmission efficiency. In this paper, the details of conditioning process were presented and one severe RF discharge breakdown was described specifically, which occurred during high power conditioning.

About this research paper

What this paper is about

The CSNS DTLs are divided into 4 cavities. The DTL-1 was transferred and installed in the CSNS Linac tunnel in August of 2015. The RF high power conditioning of DTL-1 started in December 2015 and ended in February 2016. At the end, we finished DTL-1 high power conditioning mission with peak power 1.5MW (1.1 times design value), 1.625% duty factor (650us, 25Hz). And the first beam has been successfully accelerated to the design value 21.6MeV with nearly 100% transmission efficiency. In this paper, the details of conditioning process were presented and one severe RF discharge breakdown was described specifically, which occurred during high power conditioning.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The CSNS DTLs are divided into 4 cavities. The DTL-1 was transferred and installed in the CSNS Linac tunnel in August of 2015. The RF high power conditioning of DTL-1 started in December 2015 and ended in February 2016. At the end, we finished DTL-1 high power conditioning mission with peak power 1.5MW (1.1 times design value), 1.625% duty factor (650us, 25Hz). And the first beam has been successfully accelerated to the design value 21.6MeV with nearly 100% transmission efficiency. In this paper, the details of conditioning process were presented and one severe RF discharge breakdown was described specifically, which occurred during high power conditioning.

Key concepts: Acceleration, Power (physics), Beam (structure), Conditioning, Computer science, Electrical engineering, Engineering, Physics

Related papers

Back to paper searchBrowse research topicsOriginal source
High Power Conditioning and First Beam Acceleration of the CSNS DTL-1 — Research Paper | ScholarLens