2015Unpublished venueRequires access

Value Stream Mapping - a Lean Manufacturing Tool to reduce Lead Time

Nitin Upadhye, Mridul Mittal

Open publisher page 0 citations

Abstract

The value stream mapping is a lean manufacturing technique used by Toyota Production System (TPS)/ Just in time (JIT) to visualize and design flow of information, material and production to analyze non value added and value added operations. The non-value actions are identified in each step and between each step by their waste of time and resources. The process is analyzed for opportunity to drastically reduce and simplify it. This makes the redesigned process more effective (the right things are being done) and more efficient. Lean Manufacturing Starts from the argument that adding value and reducing waste are the key goals of any business. Value stream mapping (VSM) is a lean manufacturing tool and it has emerged as the preferred way to support and implement the lean approach. Value stream mapping is different than conventional recording techniques, as it captures the information at individual stations about station cycle time, uptime or utilization of resources, setup time, WIP inventory, manpower requirement and the information flow from raw material to finish goods. The objective of this case study was to observe wastes, value adding activities and to reduce Total Lead time.

About this research paper

What this paper is about

The value stream mapping is a lean manufacturing technique used by Toyota Production System (TPS)/ Just in time (JIT) to visualize and design flow of information, material and production to analyze non value added and value added operations. The non-value actions are identified in each step and between each step by their waste of time and resources. The process is analyzed for opportunity to drastically reduce and simplify it. This makes the redesigned process more effective (the right things are being done) and more efficient. Lean Manufacturing Starts from the argument that adding value and reducing waste are the key goals of any business. Value stream mapping (VSM) is a lean manufacturing tool and it has emerged as the preferred way to support and implement the lean approach. Value stream mapping is different than conventional recording techniques, as it captures the information at individual stations about station cycle time, uptime or utilization of resources, setup time, WIP inventory, manpower requirement and the information flow from raw material to finish goods. The objective of this case study was to observe wastes, value adding activities and to reduce Total Lead time.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The value stream mapping is a lean manufacturing technique used by Toyota Production System (TPS)/ Just in time (JIT) to visualize and design flow of information, material and production to analyze non value added and value added operations. The non-value actions are identified in each step and between each step by their waste of time and resources. The process is analyzed for opportunity to drastically reduce and simplify it. This makes the redesigned process more effective (the right things are being done) and more efficient. Lean Manufacturing Starts from the argument that adding value and reducing waste are the key goals of any business. Value stream mapping (VSM) is a lean manufacturing tool and it has emerged as the preferred way to support and implement the lean approach. Value stream mapping is different than conventional recording techniques, as it captures the information at individual stations about station cycle time, uptime or utilization of resources, setup time, WIP inventory, manpower requirement and the information flow from raw material to finish goods. The objective of this case study was to observe wastes, value adding activities and to reduce Total Lead time.

Key concepts: Value stream mapping, Lean manufacturing, Lead time, Production (economics), Manufacturing engineering, Process (computing), Material flow, Information flow

Related papers

Back to paper searchBrowse research topicsOriginal source
Value Stream Mapping - a Lean Manufacturing Tool to reduce Lead Time — Research Paper | ScholarLens