A Method for Closing Deck of Cable-Stayed Bridges with a Single Erection Joint

Lihua Ling, Changsong Chen, Donghuang Yan

Open publisher page 0 citations

Abstract

This paper presents a new closure method for closing the deck in the middle span of a cable-stayed bridge. It discusses the mechanism of the single joint method and develops a regression approach for fabrication dimensions of closure segment incorporating with temperature correction based on the field measurement. Following this, the authors propose the key erection procedures and the pulling system based on the erection of Jingyue Bridge in China. The application in this completed bridge demonstrates the proposed method, simple in operation and high in accuracy.

About this research paper

What this paper is about

This paper presents a new closure method for closing the deck in the middle span of a cable-stayed bridge. It discusses the mechanism of the single joint method and develops a regression approach for fabrication dimensions of closure segment incorporating with temperature correction based on the field measurement. Following this, the authors propose the key erection procedures and the pulling system based on the erection of Jingyue Bridge in China. The application in this completed bridge demonstrates the proposed method, simple in operation and high in accuracy.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper presents a new closure method for closing the deck in the middle span of a cable-stayed bridge. It discusses the mechanism of the single joint method and develops a regression approach for fabrication dimensions of closure segment incorporating with temperature correction based on the field measurement. Following this, the authors propose the key erection procedures and the pulling system based on the erection of Jingyue Bridge in China. The application in this completed bridge demonstrates the proposed method, simple in operation and high in accuracy.

Key concepts: Closing (real estate), Closure (psychology), Bridge (graph theory), Deck, Joint (building), Span (engineering), Structural engineering, Computer science