Thermal movements of the existing Gateway Bridge
Clayton F. Parkinson, Geoff R Taplin, J Connal
Abstract
Clayton F. Parkinson, Geoff R Taplin, J Connal
Abstract
The Gateway Bridge, opened in 1986, is a post tensioned concrete box girder bridge crossing the Brisbane River, with a main span of 260 metres and approach spans ranging from 60 metres to 145 metres . The approach spans are twin-cell segmental box girders and the main spans are cast in-situ box girders . The approach spans have bearings at the tops and base of all piers . The twin blade piers that support the main span are integral with the superstructure . The bridge has two internal expansion joints and is tied into each abutment, preventing longitudinal movement at these locations . On the south side, the expansion joint is 376 m from the abutment . On the north side, the expansion joint is 731 metres from the abutment . The distance between the two expansion joints, including the main span, is 520 metres . The joint consists of a needle-beam type halving joint and modular expansion joint at deck level . The modular expansion joints on the Existing Gateway Bridge have reached the end of their useful life, and will be replaced as part of the Gateway Upgrade Project . As creep and shrinkage movements of the existing bridge have effectively ceased, the movement range of the replacement expansion joints will be largely determined by the thermal movements . In order to obtain a more accurate estimate of the thermal movement range, the movements at both of the existing modular expansion joints on the Gateway Bridge have been continuously recorded since September 2007 . Ambient temperature inside the bridge has also been recorded at both expansion joint locations . The paper summarises the thermal movements, and relates these to both the bridge ambient temperature, and the shade air temperature near the site, as recorded by the Bureau of Meteorology . The results are compared to the provisions of the Australian Bridge Design Code .
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The Gateway Bridge, opened in 1986, is a post tensioned concrete box girder bridge crossing the Brisbane River, with a main span of 260 metres and approach spans ranging from 60 metres to 145 metres . The approach spans are twin-cell segmental box girders and the main spans are cast in-situ box girders . The approach spans have bearings at the tops and base of all piers . The twin blade piers that support the main span are integral with the superstructure . The bridge has two internal expansion joints and is tied into each abutment, preventing longitudinal movement at these locations . On the south side, the expansion joint is 376 m from the abutment . On the north side, the expansion joint is 731 metres from the abutment . The distance between the two expansion joints, including the main span, is 520 metres . The joint consists of a needle-beam type halving joint and modular expansion joint at deck level . The modular expansion joints on the Existing Gateway Bridge have reached the end of their useful life, and will be replaced as part of the Gateway Upgrade Project . As creep and shrinkage movements of the existing bridge have effectively ceased, the movement range of the replacement expansion joints will be largely determined by the thermal movements . In order to obtain a more accurate estimate of the thermal movement range, the movements at both of the existing modular expansion joints on the Gateway Bridge have been continuously recorded since September 2007 . Ambient temperature inside the bridge has also been recorded at both expansion joint locations . The paper summarises the thermal movements, and relates these to both the bridge ambient temperature, and the shade air temperature near the site, as recorded by the Bureau of Meteorology . The results are compared to the provisions of the Australian Bridge Design Code .
Key concepts: Expansion joint, Girder, Structural engineering, Abutment, Joint (building), Engineering, Deck, Span (engineering)