Study on ventilation scheme and application during construction of high altitude gas tunnel
Dong Zhengbo, Shuang Cai, Juyi Hu, Liang Cheng
Abstract
Open-access reader
Dong Zhengbo, Shuang Cai, Juyi Hu, Liang Cheng
Abstract
Open-access reader
It is the key and difficult point to ensure the safety of tunnel construction by ventilation in high gas tunnel construction in high altitude and cold area. Taking ning-chan high gas tunnel as the research object, the ventilation of the tunnel is calculated, the ventilation parameters are optimized, the ventilation equipment is selected according to the calculation results, the location of the ventilation equipment is optimized, and the reasonable construction ventilation scheme is determined. The results show that through the design of the above ventilation scheme and the control of the site, it can not only ensure the ventilation demand of the super long and high gas tunnel construction in the high cold and high altitude area, but also ensure the tunnel construction in winter, and effectively save the construction ventilation cost.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
It is the key and difficult point to ensure the safety of tunnel construction by ventilation in high gas tunnel construction in high altitude and cold area. Taking ning-chan high gas tunnel as the research object, the ventilation of the tunnel is calculated, the ventilation parameters are optimized, the ventilation equipment is selected according to the calculation results, the location of the ventilation equipment is optimized, and the reasonable construction ventilation scheme is determined. The results show that through the design of the above ventilation scheme and the control of the site, it can not only ensure the ventilation demand of the super long and high gas tunnel construction in the high cold and high altitude area, but also ensure the tunnel construction in winter, and effectively save the construction ventilation cost.
Key concepts: Ventilation (architecture), Altitude (triangle), Engineering, Effects of high altitude on humans, Environmental science, Meteorology, Mechanical engineering, Mathematics