2018•海洋石油Requires access

Scheme Optimization for Sidetracking in an Oil Field in Bohai

Wu Zhanmin, Pengfei Chen, Gong Ming, Yang Xucai, Wang Xu, Duan Peng

Open publisher page 0 citations

Abstract

In order to reduce the operation difficulty, improve the production effect after sidetracking, prolong the oil well production life and ensure the borehole could be utilized again, sidetracking way were compared between shallow and deep sidetracking in order to optimize sidetracking way and reduce the difficulty of operation. Combined with the problems in the production process of lateral drilling, the advantages and disadvantages of different well structure after sidetracking were analyzed to optimize well structure. For horizontal wells with large mudstone, sand production and serious flooding in horizontal section, the scheme of perforating and completion of casing horizontal wells and gravel filling and sand controlling are designed. For horizontal wells penetrated with large shale in horizontal section, the situation of sand control pipe string sticking can be avoided.For horizontal wells with sand production and serious flooding in horizontal section, perforation in flooded well section can be avoided, and production effect could be improved. Gravel filling and completion can reduce sand production risk and prolong production life.

About this research paper

What this paper is about

In order to reduce the operation difficulty, improve the production effect after sidetracking, prolong the oil well production life and ensure the borehole could be utilized again, sidetracking way were compared between shallow and deep sidetracking in order to optimize sidetracking way and reduce the difficulty of operation. Combined with the problems in the production process of lateral drilling, the advantages and disadvantages of different well structure after sidetracking were analyzed to optimize well structure. For horizontal wells with large mudstone, sand production and serious flooding in horizontal section, the scheme of perforating and completion of casing horizontal wells and gravel filling and sand controlling are designed. For horizontal wells penetrated with large shale in horizontal section, the situation of sand control pipe string sticking can be avoided.For horizontal wells with sand production and serious flooding in horizontal section, perforation in flooded well section can be avoided, and production effect could be improved. Gravel filling and completion can reduce sand production risk and prolong production life.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In order to reduce the operation difficulty, improve the production effect after sidetracking, prolong the oil well production life and ensure the borehole could be utilized again, sidetracking way were compared between shallow and deep sidetracking in order to optimize sidetracking way and reduce the difficulty of operation. Combined with the problems in the production process of lateral drilling, the advantages and disadvantages of different well structure after sidetracking were analyzed to optimize well structure. For horizontal wells with large mudstone, sand production and serious flooding in horizontal section, the scheme of perforating and completion of casing horizontal wells and gravel filling and sand controlling are designed. For horizontal wells penetrated with large shale in horizontal section, the situation of sand control pipe string sticking can be avoided.For horizontal wells with sand production and serious flooding in horizontal section, perforation in flooded well section can be avoided, and production effect could be improved. Gravel filling and completion can reduce sand production risk and prolong production life.

Key concepts: Completion (oil and gas wells), Petroleum engineering, Directional drilling, Casing, Borehole, Drilling, Oil field, Geotechnical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source